7014 N BEVIS AVE 91405

Certificate Information: 7014 N BEVIS AVE 91405

Application / Permit
25014-20000-01128
Plan Check / Job No.
B25VN06842
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL, 15'-3" X 24'-5" IRREGULAR SHAPED ADDITION TO (E) SFD PER ENGINEERING.
Permit Issued
Issued on 4/3/2025
Issuing Office
Current Status
CofO Issued on 8/13/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/13/2025 APPLICANT
Assigned to Plan Check Engineer 3/17/2025 ARTIN ZARUKIAN
Corrections Issued 3/18/2025 ARTIN ZARUKIAN
Building Plans Picked Up 3/19/2025 APPLICANT
Plan Check Approved 4/3/2025 YAQUB MIRZA
Issued 4/3/2025 APPLICANT
CofO in Progress 8/5/2025 RYAN SALAZAR
CofO Issued 8/13/2025 RUBEN SALAS
Permit Finaled 8/13/2025 RUBEN SALAS

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 3/24/2025 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 3/24/2025 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 3/25/2025 LEE GUILBEAUX
Sewer availability Cleared 3/25/2025 LEE GUILBEAUX

Contact Information

Contractor J'S Vision Construction Inc; Lic. No.: 1043336-B 14340 VENTURA BLVD      SHERMAN OAKS, CA 91423
Engineer Mosesian,, Peter; Lic. No.: C95745 86 SMOKE TREE AVE      OAK PARK, CA 91377

Inspector Information

JOSE AVILA, (818) 374-1173 Office Hours: 7:00-8:00 AM MON-FRI
VINCENT HANLEY, (818) 374-1173 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 4/14/2025 Conditional Approval RAUL OLAGI
Excavation/Setback/Form/Re-Bar 4/17/2025 Approved RYAN SALAZAR
Footing/Foundation/Slab 4/17/2025 Approved RYAN SALAZAR
BUILDING-Rough-Frame 4/23/2025 Partial Approval WILLIAM WREN
Floor/Roof Diaphrgm/Shear Wall 4/28/2025 Partial Approval RYAN SALAZAR
PLUMBING-Rough 4/28/2025 Partial Approval RYAN SALAZAR
Deputy Drilled-In Anchors 5/7/2025 Conditional Approval RYAN SALAZAR
Floor/Roof Diaphrgm/Shear Wall 5/7/2025 Partial Approval RYAN SALAZAR
Deputy Wood Construction 5/12/2025 Conditional Approval JOAQUIN GREENOUGH
Floor/Roof Diaphrgm/Shear Wall 5/14/2025 Approved RYAN SALAZAR
Wood Frame 5/14/2025 Partial Approval RYAN SALAZAR
ELECTRICAL-Rough 5/22/2025 Approved RYAN SALAZAR
HVAC-Rough 5/22/2025 Approved RYAN SALAZAR
Interior/Exterior Lathing 5/22/2025 Partial Approval RYAN SALAZAR
PLUMBING-Rough 5/22/2025 Approved RYAN SALAZAR
Insulation 5/27/2025 Approved RYAN SALAZAR
Interior/Exterior Lathing 5/27/2025 Not Ready for Inspection RYAN SALAZAR
Shower Pan 5/27/2025 Approved RYAN SALAZAR
Drywall Nailing 5/30/2025 Approved RYAN SALAZAR
Interior/Exterior Lathing 5/30/2025 Approved RYAN SALAZAR
BUILDING-Rough-Frame 7/8/2025 Approved RYAN SALAZAR
Final 7/8/2025 Corrections Issued RYAN SALAZAR
SGSOV-Seismic Gas S/O Valve 7/8/2025 SGSOV Approved RYAN SALAZAR
Smoke Detectors 7/8/2025 Approved RYAN SALAZAR
Final 8/6/2025 OK to Issue CofO RYAN SALAZAR