1301 W 61ST ST unit 1-2 90044

Certificate Information: 1301 W 61ST ST unit 1-2 90044

Application / Permit
25014-10000-03311
Plan Check / Job No.
B25LA30242
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Junior Accessory Dwelling Unit
Work Description
CONVERSION AND ADDITION TO EXISTING GARAGE INTO A ONE-STORY 379.10SF JUNIOR ACCESSORY DWELLING UNIT PER LAMC 12.22.A.33 (c) and (e), AND 193.73 SF ADDITION AND REMODEL OF THE EXISTING ONE-STORY SINGLE FAMILY DWELLING, R3, TYPE VB, NFPA-13D FIRE-SPRINKLERED THROUGH-OUT
Permit Issued
Issued on 1/30/2026
Issuing Office
Current Status
Issued on 1/30/2026
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/22/2025 APPLICANT
Assigned to Plan Check Engineer 8/7/2025 JONATHAN PLATERO
Corrections Issued 9/8/2025 JONATHAN PLATERO
Building Plans Picked Up 9/12/2025 APPLICANT
Quality Review Completed 1/21/2026 KESETE HAREGOT
Plan Check Approved 1/30/2026 JONATHAN PLATERO
Issued 1/30/2026 APPLICANT

Permit Application Clearance Information

Address approval Cleared 10/6/2025 WALLIE JONG
Roof/Waste drainage to street Cleared 10/6/2025 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 10/8/2025 WALLIE JONG
Sewer availability Cleared 10/8/2025 WALLIE JONG
Tenant Habitability Plan Cleared 10/22/2025 HUGO GARRIDO GARZA
Community Plan Implem. Overlay Cleared 12/1/2025 MANERI ROMAN

Contact Information

Contractor Monroy M W Construction Inc; Lic. No.: 1066342-B 710 W 66TH ST      LOS ANGELES, CA 90044
Engineer Castillo,, Margarito; Lic. No.: S4808 1205 PINE AVE   SUITE 201    LONG BEACH, CA 90813

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/9/2026 Corrections Issued BARRY HACHE
PLUMBING-Rough 2/9/2026 Partial Approval BARRY HACHE
Footing/Foundation/Slab 2/12/2026 Approved SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 3/13/2026 Not Ready for Inspection BARRY HACHE
PLUMBING-Rough 3/13/2026 Approved RAUL BARAJAS
PLUMBING-Rough 3/13/2026 Not Ready for Inspection BARRY HACHE
Insulation 3/20/2026 Approved RAUL BARAJAS
Interior/Exterior Lathing 3/20/2026 Approved RAUL BARAJAS
BUILDING-Rough-Frame 3/25/2026 Conditional Approval ALEX COLIN
Drywall Nailing 3/25/2026 Corrections Issued ALEX COLIN
Green Building Rough 3/25/2026 Approved ALEX COLIN
Rough-Elec/Plmb/HVAC 3/25/2026 Approved ALEX COLIN
BUILDING-Rough-Frame 6/8/2026 Approved SABAS ALONSO
Drywall Nailing 6/8/2026 Approved SABAS ALONSO
Final 6/8/2026 Corrections Issued SABAS ALONSO
ELECTRICAL-Final 6/10/2026 Approved RAUL BARAJAS
Final 6/10/2026 Corrections Issued RAUL BARAJAS
Green Building Final 6/10/2026 Approved RAUL BARAJAS
HVAC-Final 6/10/2026 Approved RAUL BARAJAS
PLUMBING-Final 6/10/2026 Approved RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 6/10/2026 SGSOV Not Required RAUL BARAJAS
Smoke Detectors 6/10/2026 Approved RAUL BARAJAS