331 N CLIFFWOOD AVE 90049

Certificate Information: 331 N CLIFFWOOD AVE 90049

Application / Permit
25014-10000-02108
Plan Check / Job No.
B25LA19155
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN -Addition to 1st and 2nd floor of existing 2 story single family dwelling -new attached covered patio -renovate existing kitchen -replace all windows and doors -demo existing attached covered patio and add new trellis -renovate existing master bathroom and closet. ***FULLY SPRINKLERED PER NFPA 13D***
Permit Issued
Issued on 7/1/2025
Issuing Office
Current Status
Issued on 7/1/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/12/2025 APPLICANT
Assigned to Plan Check Engineer 5/15/2025 MICHAEL LOPEZ
Corrections Issued 5/21/2025 MICHAEL LOPEZ
Quality Review Completed 5/23/2025 GARO TELMI
Applicant returned to address corrections 6/18/2025 MICHAEL LOPEZ
Plan Check Approved 6/27/2025 MICHAEL LOPEZ
No Progress 7/1/2025 MICHAEL LOPEZ
Plan Check Approved 7/1/2025 MICHAEL LOPEZ
Issued 7/1/2025 APPLICANT

Permit Application Clearance Information

Hydrant and Access approval Cleared 5/31/2025 LAVEON RIDER
Eng Process Fee Ord 176,300 Cleared 6/3/2025 MICHAEL BROWN
Roof/Waste drainage to street Cleared 6/3/2025 MICHAEL BROWN
Sewer availability Cleared 6/3/2025 MICHAEL BROWN
GPI Written Notices Cleared 6/17/2025 MICHAEL LOPEZ
Grading Pre-Inspection Cleared 6/17/2025 ROBERT PINA

Contact Information

Contractor B T C Builders Inc; Lic. No.: 743191-B       ,
Engineer Yu,, Irene; Lic. No.: NA68382       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/20/2025 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 8/20/2025 Not Ready for Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 8/21/2025 Partial Approval TEMISTOCLES CAAL
Excavation/Setback/Form/Re-Bar 9/4/2025 Approved TEMISTOCLES CAAL
Footing/Foundation/Slab 9/4/2025 Approved TEMISTOCLES CAAL
Floor/Roof Diaphrgm/Shear Wall 10/10/2025 Partial Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 11/3/2025 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/5/2025 Partial Approval HERBERT GIRON
Insulation 11/20/2025 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/22/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 12/22/2025 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/29/2025 Partial Approval KEVIN SARGSYAN
Gas Test 12/29/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 12/29/2025 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 1/8/2026 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 1/15/2026 Approved KEVIN SARGSYAN
Shower Pan 1/15/2026 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 1/21/2026 Corrections Issued HERBERT GIRON
HVAC-Rough 1/23/2026 Corrections Issued HERBERT GIRON
ELECTRICAL-Rough 1/28/2026 Approved KEVIN SARGSYAN
HVAC-Rough 1/28/2026 Approved KEVIN SARGSYAN
Insulation 1/28/2026 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 1/28/2026 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 2/4/2026 Partial Approval KEVIN SARGSYAN
Gas Test 2/10/2026 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 2/10/2026 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 2/13/2026 Partial Approval KEVIN SARGSYAN
Insulation 2/19/2026 Partial Approval MICHAEL ALLEN
Insulation 2/20/2026 Approved KEVIN SARGSYAN
Drywall Nailing 3/10/2026 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 3/26/2026 Approved KEVIN SARGSYAN