13918 W VALLEYHEART DR 91423

Certificate Information: 13918 W VALLEYHEART DR 91423

Application / Permit
25014-10000-00871
Plan Check / Job No.
B25LA07425
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: NEW 20' X 14' ADDITION TO (E) ADU PER LAMC 12.22 A.33(b)(1),(c),(d),(h) and (k) . PER WFPP.
Permit Issued
Issued on 5/23/2025
Issuing Office
Current Status
CofO Issued on 11/20/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/6/2025 APPLICANT
Assigned to Plan Check Engineer 3/10/2025 MIROOSH KHACHATOORIAN
Corrections Issued 3/11/2025 MIROOSH KHACHATOORIAN
Applicant returned to address corrections 4/19/2025 GIOVANNY CHAVEZ
Plan Check Approved 4/30/2025 KAVIAN REFAHI
Issued 5/23/2025 APPLICANT
CofO in Progress 10/10/2025 MISAEL ESPARZA
Permit Finaled 11/20/2025 RUBEN SALAS
CofO Issued 11/20/2025 RUBEN SALAS

Permit Application Clearance Information

ZI Cleared 3/25/2025 NATHAN ROMINE
Roof/Waste drainage to street Cleared 4/27/2025 TAL SHEMEN
Sewer availability Cleared 4/27/2025 TAL SHEMEN
Eng Process Fee Ord 176,300 Cleared 4/28/2025 TAL SHEMEN

Contact Information

Contractor Pacific Point Builders Inc; Lic. No.: 768984-B       ,
Engineer Habibi,, Shayaan; Lic. No.: C94225 10535 WILSHIRE BLVD APT 1602      LOS ANGELES, CA 90024

Inspector Information

MISAEL ESPARZA, (818) 374-1169 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/29/2025 Partial Approval JACK KARGODORIAN
Deputy Drilled-In Anchors 6/5/2025 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 6/6/2025 Corrections Issued MISAEL ESPARZA
Footing/Foundation/Slab 6/6/2025 Partial Inspection MISAEL ESPARZA
Excavation/Setback/Form/Re-Bar 6/20/2025 Approved MISAEL ESPARZA
Footing/Foundation/Slab 6/20/2025 Approved MISAEL ESPARZA
Deputy Reinf. Concrete 6/25/2025 Conditional Approval JUAN VALENZUELA
BUILDING-Rough-Frame 7/16/2025 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 7/16/2025 Not Ready for Inspection MISAEL ESPARZA
Green Building Rough 7/16/2025 Not Ready for Inspection MISAEL ESPARZA
MERV13>=Rough 7/16/2025 Not Ready for Inspection MISAEL ESPARZA
Wood Frame 7/16/2025 Not Ready for Inspection MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 7/21/2025 Corrections Issued CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 7/24/2025 Corrections Issued KEVIN BERBERYAN
ELECTRICAL-Rough 7/24/2025 Approved KEVIN BERBERYAN
Green Building Rough 7/24/2025 Not Ready for Inspection KEVIN BERBERYAN
HVAC-Rough 7/24/2025 Approved KEVIN BERBERYAN
MERV13>=Rough 7/24/2025 Not Ready for Inspection KEVIN BERBERYAN
Interior/Exterior Lathing 8/4/2025 Approved MISAEL ESPARZA
BUILDING-Rough-Frame 8/8/2025 Conditional Approval MISAEL ESPARZA
Insulation 8/8/2025 Approved MISAEL ESPARZA
Drywall Nailing 8/13/2025 Approved MISAEL ESPARZA
Green Building Rough 8/13/2025 Approved MISAEL ESPARZA
BUILDING-Rough-Frame 10/2/2025 Approved MISAEL ESPARZA
Final 10/2/2025 Corrections Issued MISAEL ESPARZA
Green Building Final 10/2/2025 Approved MISAEL ESPARZA
MERV13>=Final 10/2/2025 Approved MISAEL ESPARZA
MERV13>=Rough 10/2/2025 Approved MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 10/2/2025 SGSOV Approved MISAEL ESPARZA
Smoke Detectors 10/2/2025 Approved MISAEL ESPARZA
Final 10/8/2025 OK to Issue CofO MISAEL ESPARZA