338 S WALKER AVE 90732

Certificate Information: 338 S WALKER AVE 90732

Application / Permit
25014-10000-00761
Plan Check / Job No.
B25LA06562
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
MAJOR REMODEL AND ADDITIONS TO EXISTING SINGLE FAMILY DWELLING. FRONT ADDITION TO SFD AND ADDITION TO GARAGE. REAR ADDITION TO SFD. NEW REAR TRELLIS ATTACHED TO SFD. NEW REAR DECK. ALL WORK DONE PER ENGINEER DESIGN. NFPA-13D FIRE SPRINKLERS TO BE INSTALLED THROUGHOUT.
Permit Issued
Issued on 3/17/2025
Issuing Office
Current Status
CofO Issued on 4/20/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/20/2025 APPLICANT
Assigned to Plan Check Engineer 2/25/2025 MADISON ODELL
Corrections Issued 2/26/2025 MADISON ODELL
Plan Check Approved 3/16/2025 MADISON O'DELL
Issued 3/17/2025 APPLICANT
CofO in Progress 4/20/2026 JOSEPH MCGARRY
Permit Finaled 4/20/2026 ANSON MAGLASANG
Permit Finaled 4/20/2026 ANSON MAGLASANG
CofO Issued 4/20/2026 ANSON MAGLASANG

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/3/2025 VASIL MIHALEV
Eng Process Fee Ord 176,300 Cleared 3/12/2025 RYAN CASTRO
Roof/Waste drainage to street Cleared 3/12/2025 RYAN CASTRO

Contact Information

Architect , ; Lic. No.: C37800       ,
Contractor Cuellar Mark A Design + Build; Lic. No.: 1065284-B       ,
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: NA91046       ,

Inspector Information

JOSEPH MCGARRY, (310) 732-4559 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 4/17/2025 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 4/22/2025 Partial Approval JOSEPH MCGARRY
Wood Frame 4/30/2025 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 5/1/2025 Partial Approval JOSEPH MCGARRY
Wood Frame 5/1/2025 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 5/23/2025 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 6/6/2025 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 6/6/2025 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 7/30/2025 Conditional Approval JOSEPH MCGARRY
ELECTRICAL-Rough 7/30/2025 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 7/30/2025 Conditional Approval JOSEPH MCGARRY
Green Building Rough 7/30/2025 Approved JOSEPH MCGARRY
HVAC-Rough 7/30/2025 Approved JOSEPH MCGARRY
PLUMBING-Rough 7/30/2025 Approved JOSEPH MCGARRY
Deputy Wood Construction 8/1/2025 Partial Approval JOSEPH MCGARRY
Deputy Wood Construction 8/7/2025 Conditional Approval TEMISTOCLES CAAL
BUILDING-Rough-Frame 8/20/2025 Approved JOSEPH MCGARRY
Insulation 8/20/2025 Approved JOSEPH MCGARRY
Verify Sprinkler Sign Off 8/20/2025 Approved JOSEPH MCGARRY
Drywall Nailing 9/5/2025 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 9/5/2025 Approved JOSEPH MCGARRY
Shower Pan 9/5/2025 Approved JOSEPH MCGARRY
Service/Power Release 1/5/2026 Not Ready for Inspection JOSEPH MCGARRY
Service/Power Release 1/16/2026 Approved JOSEPH MCGARRY
Final 4/6/2026 Corrections Issued EUGENE CASSIDY
Green Building Final 4/6/2026 Not Ready for Inspection EUGENE CASSIDY
SGSOV-Seismic Gas S/O Valve 4/6/2026 SGSOV Not Required EUGENE CASSIDY
Smoke Detectors 4/6/2026 Not Ready for Inspection EUGENE CASSIDY
Final 4/15/2026 Not Ready for Inspection JOSEPH MCGARRY
Green Building Final 4/15/2026 Approved JOSEPH MCGARRY
Smoke Detectors 4/15/2026 Approved JOSEPH MCGARRY
Final 4/17/2026 OK to Issue CofO JOSEPH MCGARRY