429 N MARTEL AVE 90036

Certificate Information: 429 N MARTEL AVE 90036

Application / Permit
25010-20000-05280
Plan Check / Job No.
B25VN32742
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW DETACHED 1-STORY ACCESSORY DWELLING UNIT TO COMPLY WITH GCS 66323(a)(2) PER ENGINEERING. NFPA-13D FIRE SPRINKER THRU-OUT
Permit Issued
Issued on 2/10/2026
Issuing Office
Current Status
Issued on 2/10/2026
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/6/2025 APPLICANT
Assigned to Plan Check Engineer 11/13/2025 ALFRED RAMIREZ
Assigned to Zoning Architect 11/13/2025 JASON BRAVO
Corrections Issued 11/16/2025 ALFRED RAMIREZ
Quality Review Completed 11/19/2025 STEVEN KIM
Building Plans Picked Up 11/20/2025 APPLICANT
Applicant returned to address corrections 1/27/2026 ALFRED RAMIREZ
Plan Check Approved 2/10/2026 ALFRED RAMIREZ
Issued 2/10/2026 APPLICANT

Permit Application Clearance Information

Address approval Cleared 11/26/2025 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 11/26/2025 ABEL CASILLAS
Sewer availability Cleared 11/26/2025 ABEL CASILLAS
Low Impact Development (LID) Cleared 1/16/2026 LUIS LUVANO
Miscellaneous Cleared 1/23/2026 ALEX VELA
Miscellaneous Cleared 1/23/2026 ALEX VELA
Roof/Waste drainage to street Cleared 1/23/2026 VLADIMIR ARUTYUNYAN
Zoning Plan Check Cleared 2/5/2026 ALFRED RAMIREZ
Construction near power lines Cleared 2/10/2026 AARON DIZON

Contact Information

Contractor Owner-Builder       ,
Engineer Amar,, David; Lic. No.: C97582 6160 CORBIN AVENUE      TARZANA, CA 91356

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

BUILDING-Rough-Frame 6/8/2026   
PLUMBING-Rough 6/8/2026   
Verify Sprinkler Sign Off 6/8/2026   
Green Building Rough 6/8/2026   

Inspection Request History

PLUMBING-Rough 2/13/2026 Partial Approval JOSH MEISTER
Deputy Methane Barrier 3/3/2026 Approved JOSH MEISTER
Excavation/Setback/Form/Re-Bar 3/3/2026 Approved JOSH MEISTER
METHANE-Barrier 3/3/2026 Not Ready for Inspection JOSH MEISTER
METHANE-Rough 3/3/2026 Approved JOSH MEISTER
METHANE-Subgrade 3/3/2026 Approved JOSH MEISTER
Footing/Foundation/Slab 3/10/2026 Approved ALIZAH MAYAGOITIA
METHANE-Barrier 3/10/2026 Approved ALIZAH MAYAGOITIA
Deputy Wood Construction 3/31/2026 Conditional Approval ALEX COLIN
Floor/Roof Diaphrgm/Shear Wall 3/31/2026 Not Ready for Inspection JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 4/14/2026 Not Ready for Inspection JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 4/15/2026 Conditional Approval JOSH MEISTER
Deputy Wood Construction 5/18/2026 Conditional Approval JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 5/20/2026 Not Ready for Inspection JOSH MEISTER
ELECTRICAL-Rough 5/26/2026 Approved JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 5/26/2026 Approved JOSH MEISTER
HVAC-Rough 5/26/2026 Not Ready for Inspection JOSH MEISTER
PLUMBING-Rough 5/26/2026 Not Ready for Inspection JOSH MEISTER
Shower Pan 5/28/2026 Approved JEFFREY MEAD
HVAC-Rough 6/3/2026 Approved JOSH MEISTER
PLUMBING-Rough 6/3/2026 Not Ready for Inspection JOSH MEISTER
Shower Pan 6/3/2026 Approved JOSH MEISTER