4516-4516 1/2 S 9TH AVE 90043

Certificate Information: 4516-4516 1/2 S 9TH AVE 90043

Application / Permit
25010-20000-04885
Plan Check / Job No.
B25VN30641
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSE 22'-10"X36' TWO STORY TWO UNITS ACCESSORY DWELLING UNIT [PER GC66323(a)(4)] WITH ATTACHED 3'X14'-8" PORCH ENTRY: CONSIST OF ONE ADU ON EACH FLOOR, AND SECOND STORY UNIT WITH EXTERIOR STAIR ACCESS _ BUILDING SHALL BE FULLY SPRINKLER THROUGHOUT WITH NFPA 13D.
Permit Issued
Issued on 1/30/2026
Issuing Office
Valley
Current Status
CofO Issued on 7/16/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/17/2025 APPLICANT
Assigned to Plan Check Engineer 10/30/2025 DAWN MC NULTY
Assigned to Zoning Architect 10/30/2025 SAAD LADHANI
Corrections Issued 11/13/2025 DAWN MC NULTY
Quality Review Completed 11/21/2025 OMID HEDAYAT
Building Plans Picked Up 11/25/2025 APPLICANT
Plan Check Approved 1/22/2026 DAWN MC NULTY
Issued 1/30/2026 APPLICANT
CofO in Progress 7/15/2026 ALIZAH MAYAGOITIA
Permit Finaled 7/16/2026 DEROLD HAUFF
CofO Issued 7/16/2026 DEROLD HAUFF
Permit Finaled 7/16/2026 DEROLD HAUFF

Permit Application Clearance Information

Zoning Plan Check Cleared 11/24/2025 SAAD LADHANI
Hydrant and Access approval Cleared 12/18/2025 FRANK GOMEZ
Address approval Cleared 12/23/2025 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 12/24/2025 CARLOS AGUILERA
Sewer availability Cleared 12/24/2025 CARLOS AGUILERA
Construction near power lines Cleared 1/8/2026 RIDWAN HARDY
Construction within easement Cleared 1/8/2026 RIDWAN HARDY
Roof/Waste drainage to street Cleared 1/9/2026 JEANIE LAM
Hold Cleared 2/24/2026 MARIA VENDIVIL

Contact Information

Architect Miller,, Michael; Lic. No.: C26956 12756 MITCHELL AVE      LOS ANGELES, CA 90066
Contractor Owner-Builder       ,

Inspector Information

LUIS CASTRO, (213) 202-3436 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 2/3/2026 Partial Approval LUIS CASTRO
Excavation/Setback/Form/Re-Bar 2/6/2026 Corrections Issued LUIS CASTRO
Footing/Foundation/Slab 2/6/2026 Corrections Issued LUIS CASTRO
Excavation/Setback/Form/Re-Bar 2/11/2026 Approved LUIS CASTRO
Footing/Foundation/Slab 2/11/2026 Approved LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 2/25/2026 Corrections Issued LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 3/26/2026 Partial Approval LUIS CASTRO
Deputy Wood Construction 3/27/2026 Partial Approval LUIS CASTRO
Special/Order Compliance 3/31/2026 Approved LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 4/6/2026 Approved LUIS CASTRO
BUILDING-Rough-Frame 4/21/2026 Not Ready for Inspection LUIS CASTRO
ELECTRICAL-Rough 4/21/2026 Approved LUIS CASTRO
Green Building Rough 4/21/2026 Approved LUIS CASTRO
HVAC-Rough 4/21/2026 Partial Approval LUIS CASTRO
PLUMBING-Rough 4/21/2026 Partial Approval LUIS CASTRO
Verify Sprinkler Sign Off 4/21/2026 Approved LUIS CASTRO
BUILDING-Rough-Frame 4/22/2026 Corrections Issued LUIS CASTRO
Interior/Exterior Lathing 4/22/2026 Partial Approval LUIS CASTRO
BUILDING-Rough-Frame 4/24/2026 Approved ALEX COLIN
Insulation 4/24/2026 Approved ALEX COLIN
Drywall Nailing 4/28/2026 Approved LUIS CASTRO
Underground Mechanical 6/4/2026 Approved LUIS CASTRO
Final 6/26/2026 Corrections Issued LUIS CASTRO
Green Building Final 6/26/2026 Approved LUIS CASTRO
SGSOV-Seismic Gas S/O Valve 6/26/2026 SGSOV Not Ready LUIS CASTRO
Service/Power Release 6/26/2026 Not Ready for Inspection LUIS CASTRO
Smoke Detectors 6/26/2026 Approved LUIS CASTRO
Final 7/14/2026 OK to Issue CofO ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 7/14/2026 SGSOV Approved ALIZAH MAYAGOITIA
Service/Power Release 7/14/2026 Approved ALIZAH MAYAGOITIA