638-640 N EDINBURGH AVE 90048

Certificate Information: 638-640 N EDINBURGH AVE 90048

Application / Permit
25010-20000-02955
Plan Check / Job No.
B25VN18880
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SFD WITH ATTACHED TWO CARS GARAGE AND WITH 2-STORY ATTACHED ACCESSORY DWELLING UNIT AS PER LAMC 12.22 A.33(c)&(e), NFPA-13D FIRE SPRINKLERS REQUIRED THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 8/4/2025
Issuing Office
Current Status
Issued on 8/4/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/1/2025 APPLICANT
Assigned to Plan Check Engineer 7/2/2025 RARES BODEA
Assigned to Zoning Architect 7/3/2025 LY CHEA
Corrections Issued 7/7/2025 RARES BODEA
Quality Review Completed 7/11/2025 STEVEN KIM
Building Plans Picked Up 7/11/2025 APPLICANT
Plan Check Approved 8/4/2025 RARES BODEA
Issued 8/4/2025 APPLICANT

Permit Application Clearance Information

Low Impact Development (LID) Cleared 7/11/2025 ERNEST TSE
Address approval Cleared 7/14/2025 MICHAEL BROWN
Roof/Waste drainage to street Cleared 7/14/2025 MICHAEL BROWN
Eng Process Fee Ord 176,300 Cleared 7/15/2025 MICHAEL BROWN
Sewer availability Cleared 7/15/2025 MICHAEL BROWN
Hydrant and Access approval Cleared 7/18/2025 PATRICK PEREZ
CPC Cleared 7/21/2025 DORIAN AGUILAR
CPC Cleared 7/21/2025 DORIAN AGUILAR
Zoning Plan Check Cleared 8/1/2025 RARES BODEA

Contact Information

Contractor Owner-Builder       ,
Engineer Yuzon,, Benigno Sari; Lic. No.: S3454 2511 PEACHWOOD PLACE      WESTLAKE VILLAGE, CA 91361

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 9/11/2025 Corrections Issued JOSE MACIAS
Sewer 9/12/2025 Not Ready for Inspection RAUL BARAJAS
Underground Mechanical 9/12/2025 Not Ready for Inspection RAUL BARAJAS
Underground Mechanical 9/15/2025 Not Ready for Inspection JOSE MACIAS
Underground Mechanical 9/16/2025 Corrections Issued JOSE MACIAS
Footing/Foundation/Slab 10/7/2025 Corrections Issued JOSH MEISTER
METHANE-Barrier 10/7/2025 Approved JOSH MEISTER
METHANE-Subgrade 10/7/2025 Approved JOSH MEISTER
Excavation/Setback/Form/Re-Bar 10/10/2025 Corrections Issued JOSH MEISTER
Excavation/Setback/Form/Re-Bar 10/11/2025 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 10/14/2025 Not Ready for Inspection JOSH MEISTER
Excavation/Setback/Form/Re-Bar 10/17/2025 Approved JOSH MEISTER
Deputy Steel/Welding 10/24/2025 Conditional Approval JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 11/25/2025 Partial Approval JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 12/18/2025 Corrections Issued JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 12/23/2025 Approved ENRIQUE MIRELES
Floor/Roof Diaphrgm/Shear Wall 1/9/2026 Not Ready for Inspection JOSH MEISTER
Drywall Nailing 1/20/2026 Not Ready for Inspection JOSH MEISTER
Green Building Rough 1/20/2026 Not Ready for Inspection JOSH MEISTER
HVAC-Rough 2/20/2026 Corrections Issued JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 2/23/2026 Conditional Approval JOSH MEISTER
PLUMBING-Rough 3/5/2026 Approved ALIZAH MAYAGOITIA
ELECTRICAL-Rough 3/16/2026 Approved JOSH MEISTER
Shower Pan 3/16/2026 Approved JOSH MEISTER
BUILDING-Rough-Frame 3/24/2026 Approved JOSH MEISTER
Green Building Rough 3/24/2026 Approved JOSH MEISTER
Interior/Exterior Lathing 3/24/2026 Partial Approval JOSH MEISTER
METHANE-Rough 3/24/2026 Approved JOSH MEISTER
Verify Sprinkler Sign Off 3/24/2026 Approved JOSH MEISTER
Insulation 3/31/2026 Not Ready for Inspection ALEX COLIN
Insulation 4/6/2026 Approved JOSH MEISTER
Interior/Exterior Lathing 4/6/2026 Not Ready for Inspection JOSH MEISTER
Interior/Exterior Lathing 4/9/2026 Approved JOSH MEISTER
Interior/Exterior Lathing 4/10/2026 Approved JOSH MEISTER
Drywall Nailing 4/29/2026 Approved JOSH MEISTER
Interior/Exterior Lathing 5/20/2026 Approved JOSH MEISTER