6216 S SAN PEDRO ST 90003

Certificate Information: 6216 S SAN PEDRO ST 90003

Application / Permit
25010-20000-00883
Plan Check / Job No.
B25VN05191
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
eplan (N) 2-STORY BUILDING WITH CARPORT ON LOWER LEVEL AND ADU ON 2ND LEVEL. DETACHED ADU PER LAMC 12.22 A.33 (b)(1). TO BE EQUIPPED WITH NFPA13D FIRE SPRINKLERS THROUGH OUT.
Permit Issued
Issued on 12/27/2025
Issuing Office
Current Status
Issued on 12/27/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/5/2025 APPLICANT
Assigned to Plan Check Engineer 3/20/2025 ADRIANA LOPEZ
Corrections Issued 4/11/2025 ADRIANA LOPEZ
Quality Review Completed 4/22/2025 JOSE RODRIGUEZ
Applicant returned to address corrections 5/12/2025 ADRIANA LOPEZ
Applicant returned to address corrections 10/9/2025 ADRIANA LOPEZ
Applicant returned to address corrections 10/15/2025 ADRIANA LOPEZ
Applicant returned to address corrections 11/10/2025 ADRIANA LOPEZ
Plan Check Approved 12/23/2025 ADRIANA LOPEZ
Issued 12/27/2025 APPLICANT

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 5/28/2025 BRANDON WONG
Community Plan Implem. Overlay Cleared 5/29/2025 WALTER RAMIREZ
Address approval Cleared 7/1/2025 WALLIE JONG
Community Plan Implem. Overlay Cleared 7/1/2025 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 7/14/2025 WALLIE JONG
Sewer availability Cleared 7/14/2025 WALLIE JONG
Community Plan Implem. Overlay Cleared 8/1/2025 ANACANY HURTADO
ZI Cleared 8/1/2025 ANACANY HURTADO
Roof/Waste drainage to street Cleared 8/4/2025 WALLIE JONG
Community Plan Implem. Overlay Cleared 8/21/2025 JOSE CARDENAS

Contact Information

Contractor Owner-Builder       ,
Engineer Castillo,, Margarito; Lic. No.: S4808 1205 PINE AVE   SUITE 201    LONG BEACH, CA 90813

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/12/2026 Partial Inspection SABAS ALONSO
Pre-Inspection 3/26/2026 Partial Inspection SABAS ALONSO
Footing/Foundation/Slab 4/3/2026 Corrections Issued SABAS ALONSO
Footing/Foundation/Slab 4/16/2026 Corrections Issued MICHAEL LEWIS
Excavation/Setback/Form/Re-Bar 4/21/2026 Approved MICHAEL LEWIS
Footing/Foundation/Slab 4/21/2026 Partial Approval MICHAEL LEWIS
Footing/Foundation/Slab 5/27/2026 Corrections Issued BRENDAN MORELLI
Footing/Foundation/Slab 6/10/2026 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 6/17/2026 Partial Approval LUIS CASTRO
BUILDING-Rough-Frame 7/22/2026 No Result Entered LUIS CASTRO
Green Building Rough 7/22/2026 No Result Entered LUIS CASTRO
Verify Sprinkler Sign Off 7/22/2026 No Result Entered LUIS CASTRO