6100 N WOODLEY AVE 91406
Certificate Information: 6100 N WOODLEY AVE 91406
- Application / Permit
- 25010-20000-00615
- Plan Check / Job No.
- B25VN03411
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Commercial
- Primary Use
- (15) Sewage Disposal or Treatment Plant
- Work Description
- (N) ADVANCED WATER PURIFICATION FACILITY BUILDING, TYPE II-B , OCCUPANCY F-1, B , NFPA-13 FIRE SPRINKLERS THROUGHOUT , ALL WORK PER ENGINEERING
- Permit Issued
- Issued on 7/31/2025
- Issuing Office
- Valley
- Current Status
- Issued on 7/31/2025
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 2/11/2025 | APPLICANT |
| Assigned to Plan Check Engineer | 2/13/2025 | RARES BODEA |
| Assigned to Zoning Architect | 2/13/2025 | FRANCIS AHN |
| Disabled Access Plans Picked Up | 2/18/2025 | APPLICANT |
| Corrections Issued | 2/19/2025 | RARES BODEA |
| Green Plans Picked Up | 2/20/2025 | APPLICANT |
| Quality Review Completed | 2/21/2025 | STEVEN KIM |
| Building Plans Picked Up | 2/24/2025 | APPLICANT |
| Applicant returned to address corrections | 3/13/2025 | RARES BODEA |
| Applicant returned to address corrections | 4/15/2025 | RARES BODEA |
| Plan Check Approved | 7/29/2025 | RARES BODEA |
| Issued | 7/31/2025 | APPLICANT |
Permit Application Clearance Information
| DAS Clearance | Cleared | 2/18/2025 | RARES BODEA |
| Low Impact Development (LID) | Cleared | 2/21/2025 | MARTIN FRAGOSO |
| Roof/Waste drainage to street | Cleared | 2/26/2025 | CARLOS AGUILERA |
| Eng Process Fee Ord 176,300 | Cleared | 2/27/2025 | CARLOS AGUILERA |
| ZA Case | Cleared | 2/27/2025 | BRENNEN OBETO |
| Address approval | Cleared | 2/28/2025 | CARLOS AGUILERA |
| ZA Case | Cleared | 3/3/2025 | RUBEN VASQUEZ |
| Sewer availability | Cleared | 3/11/2025 | CARLOS AGUILERA |
| Green Code | Cleared | 4/15/2025 | MICHAEL AYERS |
| Metro Rail approval | Cleared | 5/12/2025 | JENNIFER SU |
| City owned building/parcel | Cleared | 5/14/2025 | MASON NG |
| Highway dedication | Cleared | 5/21/2025 | CARLOS AGUILERA |
| "Q" conditions | Cleared | 5/27/2025 | DAVID URITA |
| CPC | Cleared | 5/27/2025 | DAVID URITA |
| ZA Case | Cleared | 5/27/2025 | DAVID URITA |
| ZA Case | Cleared | 5/27/2025 | DAVID URITA |
| ZI | Cleared | 5/27/2025 | DAVID URITA |
| ZI | Cleared | 5/27/2025 | DAVID URITA |
| ZI | Cleared | 5/27/2025 | DAVID URITA |
| Building over 36-ft | Cleared | 6/5/2025 | CALOSHA APPROVED |
| Excavation more than 5-ft deep | Cleared | 6/5/2025 | CALOSHA APPROVED |
| Hydrant and Access approval | Cleared | 6/10/2025 | KURT CORRAL |
| Fire Marshal Fire Life Safety | Cleared | 7/10/2025 | WILLIAM JOHNS |
| Zoning Plan Check | Cleared | 7/10/2025 | RARES BODEA |
Contact Information
| Architect | Johnson,, David Michael; Lic. No.: C18045 | 3638 AUREOLA BLVD LOS ANGELES, CA 90008 |
| Contractor | Jacobs Project Management Co; Lic. No.: 920855-B | 120 S CENTRAL AVE SUITE 350 CLAYTON, MO 63105 |
| Engineer | Patel,, Subhash; Lic. No.: S4233 | 1512 WILDGROVE WAY VISTA, CA 92081 |
Inspector Information
| ROBERT DAVIS, (818) 374-1125 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| Deputy Reinf. Concrete | 7/24/2026 |
| Footing/Foundation/Slab | 7/28/2026 |
Inspection Request History
| Special/Order Compliance | 7/11/2025 | Partial Approval | ROBERT DAVIS |
| Special/Order Compliance | 7/22/2025 | Partial Approval | ROBERT DAVIS |
| Special/Order Compliance | 7/29/2025 | Partial Approval | ROBERT DAVIS |
| Deputy Grading | 8/5/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/6/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/7/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Grading | 8/8/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/11/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/12/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/13/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/14/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/15/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/18/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/19/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Grading | 8/20/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Grading | 8/21/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Grading | 8/22/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Grading | 8/25/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/26/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/27/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/28/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 8/29/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 9/2/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 9/3/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 9/4/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 9/5/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/8/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/9/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/10/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 9/11/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/12/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/15/2025 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 9/15/2025 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/16/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/17/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/18/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/19/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 9/23/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Reinf. Concrete | 9/23/2025 | Conditional Approval | GREGORY POMISH |
| Footing/Foundation/Slab | 9/23/2025 | Partial Approval | GREGORY POMISH |
| Deputy Grading | 9/24/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/24/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 9/25/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 9/26/2025 | Approved | JOHN KITCKO |
| Reinforced Concrete Frame | 9/26/2025 | Partial Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 9/29/2025 | Approved | JOHN KITCKO |
| Deputy Reinf. Concrete | 9/30/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/1/2025 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 10/1/2025 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/2/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/3/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 10/6/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/7/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/8/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 10/8/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/9/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 10/9/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/10/2025 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 10/15/2025 | Partial Approval | DEANDRE HOFFMAN |
| Excavation/Setback/Form/Re-Bar | 10/16/2025 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 10/17/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 10/20/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 10/21/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 10/22/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Grading | 10/23/2025 | Conditional Approval | BRIAN KELLY |
| Deputy Grading | 10/24/2025 | Conditional Approval | BRIAN KELLY |
| Deputy Grading | 10/28/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Grading | 10/29/2025 | Conditional Approval | JOHN KITCKO |
| Deputy Grading | 10/30/2025 | Conditional Approval | BRIAN KELLY |
| Deputy Grading | 10/31/2025 | Approved | JOHN KITCKO |
| Footing/Foundation/Slab | 10/31/2025 | Partial Approval | JOHN KITCKO |
| Deputy Grading | 11/3/2025 | Approved | JOHN KITCKO |
| Deputy Reinf. Concrete | 11/3/2025 | Approved | JOHN KITCKO |
| Deputy Grading | 11/4/2025 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 11/12/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Grading | 11/13/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Grading | 11/19/2025 | Conditional Approval | BRIAN KELLY |
| Deputy Grading | 11/20/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Grading | 11/21/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Grading | 11/25/2025 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 12/1/2025 | Not Ready for Inspection | ROBERT DAVIS |
| Excavation/Setback/Form/Re-Bar | 12/2/2025 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 12/3/2025 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 12/3/2025 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 12/4/2025 | Conditional Approval | ROBERT DAVIS |
| Excavation/Setback/Form/Re-Bar | 12/4/2025 | Not Ready for Inspection | ROBERT DAVIS |
| Deputy Reinf. Concrete | 12/5/2025 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 12/8/2025 | Partial Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 12/9/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 12/10/2025 | Conditional Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 12/11/2025 | Conditional Approval | GREGORY POMISH |
| Deputy Reinf. Concrete | 12/12/2025 | Approved | JOHN KITCKO |
| Footing/Foundation/Slab | 12/12/2025 | Partial Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 12/15/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 12/16/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 12/17/2025 | Approved | JOHN KITCKO |
| Footing/Foundation/Slab | 12/17/2025 | Partial Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 12/18/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 12/19/2025 | Approved | JOHN KITCKO |
| Footing/Foundation/Slab | 12/19/2025 | Partial Approval | JOHN KITCKO |
| Deputy Reinf. Concrete | 12/23/2025 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 1/5/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/6/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/7/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/8/2026 | Approved | ROBERT DAVIS |
| Excavation/Setback/Form/Re-Bar | 1/8/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/9/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 1/9/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/13/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/14/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/15/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 1/15/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/16/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/20/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/21/2026 | Approved | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/22/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/23/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 1/23/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/26/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/27/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 1/27/2026 | Not Ready for Inspection | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/28/2026 | Approved | ROBERT DAVIS |
| Excavation/Setback/Form/Re-Bar | 1/28/2026 | Partial Inspection | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/29/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/30/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 2/2/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/4/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/5/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 2/5/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/6/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/9/2026 | Conditional Approval | GREGORY POMISH |
| Footing/Foundation/Slab | 2/9/2026 | Partial Approval | GREGORY POMISH |
| Deputy Reinf. Concrete | 2/10/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/11/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/12/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/13/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 2/13/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/17/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/18/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/23/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/24/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/25/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/26/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 2/26/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 2/27/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/2/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/3/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/5/2026 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 3/6/2026 | Conditional Approval | BRIAN KELLY |
| Deputy Reinf. Concrete | 3/9/2026 | Approved | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/10/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 3/10/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/11/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/12/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/13/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/16/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/17/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/18/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/19/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/20/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/23/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/24/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/25/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/26/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/27/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Drilled-In Anchors | 3/31/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 3/31/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 3/31/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/1/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/2/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 4/2/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/3/2026 | Conditional Approval | GREGORY POMISH |
| Deputy Reinf. Concrete | 4/9/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/10/2026 | Approved | ROBERT DAVIS |
| Footing/Foundation/Slab | 4/10/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/13/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 4/13/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/14/2026 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 4/15/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/21/2026 | Conditional Approval | ROBERT DAVIS |
| Reinforced Concrete Frame | 4/21/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/27/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/28/2026 | Approved | ROBERT DAVIS |
| Pre-Inspection | 4/28/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/29/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 4/30/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 5/1/2026 | Approved | ROBERT DAVIS |
| Deputy Steel/Welding | 5/4/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/5/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 5/6/2026 | Approved | ROBERT DAVIS |
| Deputy Steel/Welding | 5/6/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 5/6/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/12/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 5/15/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/15/2026 | Approved | JOHN KITCKO |
| Deputy Steel/Welding | 5/18/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/19/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/20/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/21/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 5/26/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/28/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 5/29/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 6/1/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 6/1/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 6/2/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 6/3/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 6/4/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Grading | 6/5/2026 | Conditional Approval | ROBERT DAVIS |
| Reinforced Concrete Frame | 6/5/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 6/9/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Drilled-In Anchors | 6/17/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 6/17/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 6/22/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 6/23/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 6/24/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 6/24/2026 | Conditional Approval | ROBERT DAVIS |
| Excavation/Setback/Form/Re-Bar | 6/24/2026 | Partial Approval | SEAN GRIFFITH |
| Deputy Reinf. Concrete | 6/25/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 6/26/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 6/29/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 6/30/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/6/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 7/6/2026 | Partial Inspection | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/7/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/8/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 7/8/2026 | Partial Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/9/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/10/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/22/2026 | Conditional Approval | ROBERT DAVIS |
| Deputy Reinf. Concrete | 7/23/2026 | Conditional Approval | ROBERT DAVIS |
| Footing/Foundation/Slab | 7/23/2026 | Partial Approval | ROBERT DAVIS |