1857 W 24TH ST UNIT 7-8 90018

Certificate Information: 1857 W 24TH ST UNIT 7-8 90018

Application / Permit
25010-10000-02632
Plan Check / Job No.
B25LA19206
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN NEW 2-STORY 2-DETACHED ADUs PER STATE LAW. WORK DONE PER ENGINEER DESIGN. BUILDING B ADU#3:388.28SQFT ADU#4:388.28SQFT 2 OF 2
Permit Issued
Issued on 9/8/2025
Issuing Office
Current Status
Issued on 9/8/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/14/2025 APPLICANT
Assigned to Plan Check Engineer 6/5/2025 KHUONG TRUONG
Corrections Issued 6/11/2025 KHUONG TRUONG
Quality Review Completed 6/20/2025 GARO TELMI
Applicant returned to address corrections 8/21/2025 KHUONG TRUONG
Plan Check Approved 8/27/2025 KHUONG TRUONG
Issued 9/8/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 6/23/2025 JEANIE LAM
Roof/Waste drainage to street Cleared 6/23/2025 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 6/25/2025 JEANIE LAM
Sewer availability Cleared 6/25/2025 JEANIE LAM
Construction near power lines Cleared 8/27/2025 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761
Engineer Nester,, Melvin Russell; Lic. No.: C26324 2902 TYLER CT      SIMI VALLEY, CA 93063

Inspector Information

WILLIAM SIERRA, (213) 202-3122 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Drywall Nailing 7/24/2026   

Inspection Request History

Pre-Inspection 9/11/2025 Partial Inspection WILLIAM SIERRA
Excavation/Setback/Form/Re-Bar 10/6/2025 Partial Approval WILLIAM SIERRA
Footing/Foundation/Slab 10/6/2025 Corrections Issued WILLIAM SIERRA
METHANE-Barrier 10/6/2025 Not Ready for Inspection WILLIAM SIERRA
METHANE-Subgrade 10/6/2025 Not Ready for Inspection WILLIAM SIERRA
Excavation/Setback/Form/Re-Bar 10/15/2025 Approved WILLIAM SIERRA
Footing/Foundation/Slab 10/15/2025 Partial Approval WILLIAM SIERRA
METHANE-Barrier 10/15/2025 Not Ready for Inspection WILLIAM SIERRA
METHANE-Subgrade 10/15/2025 Not Ready for Inspection WILLIAM SIERRA
Deputy Reinf. Concrete 10/16/2025 Conditional Approval DEVON JACKSON
Underground Mechanical 10/30/2025 Approved WILLIAM SIERRA
Deputy Methane Barrier 11/3/2025 Conditional Approval OSVALDO PARAMO
Deputy Methane Barrier 11/10/2025 Conditional Approval OSVALDO PARAMO
Deputy Methane Barrier 11/13/2025 Conditional Approval OSVALDO PARAMO
Deputy Methane Barrier 11/18/2025 Conditional Approval OSVALDO PARAMO
Footing/Foundation/Slab 11/24/2025 Approved WILLIAM SIERRA
METHANE-Barrier 11/24/2025 Approved WILLIAM SIERRA
METHANE-Subgrade 11/24/2025 Approved WILLIAM SIERRA
Interior/Exterior Lathing 1/22/2026 Partial Approval RONNIE MINDANAO
Wood Frame 1/29/2026 Partial Approval WILLIAM SIERRA
Interior/Exterior Lathing 2/11/2026 Partial Approval WILLIAM SIERRA
Wood Frame 3/23/2026 Partial Inspection WILLIAM SIERRA
ELECTRICAL-Rough 5/15/2026 Corrections Issued WILLIAM SIERRA
Floor/Roof Diaphrgm/Shear Wall 5/15/2026 Approved WILLIAM SIERRA
Green Building Rough 5/15/2026 Not Ready for Inspection WILLIAM SIERRA
HVAC-Rough 5/15/2026 Not Ready for Inspection WILLIAM SIERRA
MERV13>=Rough 5/15/2026 Not Ready for Inspection WILLIAM SIERRA
METHANE-Rough 5/15/2026 Corrections Issued WILLIAM SIERRA
PLUMBING-Rough 5/15/2026 Corrections Issued WILLIAM SIERRA
Verify Sprinkler Sign Off 5/15/2026 Approved WILLIAM SIERRA
BUILDING-Rough-Frame 6/18/2026 Corrections Issued JOSH MEISTER
ELECTRICAL-Rough 6/18/2026 Approved JOSH MEISTER
HVAC-Rough 6/18/2026 Approved JOSH MEISTER
METHANE-Rough 6/18/2026 Not Ready for Inspection JOSH MEISTER
PLUMBING-Rough 6/18/2026 Approved JOSH MEISTER
BUILDING-Rough-Frame 7/7/2026 Approved FREDDIE RIVERA
Green Building Rough 7/7/2026 Approved FREDDIE RIVERA
Interior/Exterior Lathing 7/7/2026 Partial Approval FREDDIE RIVERA
MERV13>=Rough 7/7/2026 Approved FREDDIE RIVERA
METHANE-Rough 7/7/2026 Approved FREDDIE RIVERA
Shower Pan 7/7/2026 Approved FREDDIE RIVERA
Insulation 7/14/2026 Approved WILLIAM SIERRA