852-854 W 134TH ST 90247

Certificate Information: 852-854 W 134TH ST 90247

Application / Permit
25010-10000-00174
Plan Check / Job No.
B25LA01543
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePLAN. TWO NEW DETACHED ACCESSORY DWELLING UNITS PER GC 66323(a)(4)
Permit Issued
Issued on 6/6/2025
Issuing Office
Current Status
CofO Issued on 3/2/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/20/2025 APPLICANT
Assigned to Plan Check Engineer 1/30/2025 KEVIN MORALES
Corrections Issued 2/6/2025 KEVIN MORALES
Quality Review Completed 2/10/2025 EUGENE BARBEAU
Plan Check Approved 4/3/2025 KEVIN MORALES
Issued 6/6/2025 APPLICANT
CofO in Progress 2/26/2026 BEN MOLSTAD
Permit Finaled 3/2/2026 ANSON MAGLASANG
CofO Issued 3/2/2026 ANSON MAGLASANG
Permit Finaled 3/2/2026 ANSON MAGLASANG

Permit Application Clearance Information

Address approval Cleared 3/3/2025 WALLIE JONG
Roof/Waste drainage to street Cleared 3/12/2025 CHRISTINA BRACO
Eng Process Fee Ord 176,300 Cleared 3/20/2025 WALLIE JONG
Sewer availability Cleared 4/3/2025 CINDY QI

Contact Information

Contractor Mofakham Arash; Lic. No.: 1035634-B 12340 MONTANA AVE UNIT #106      LOS ANGELES, CA 90049

Inspector Information

BEN MOLSTAD, (310) 732-4557 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/17/2025 No Access for Inspection BEN MOLSTAD
Pre-Inspection 6/17/2025 No Access for Inspection BEN MOLSTAD
Excavation/Setback/Form/Re-Bar 6/23/2025 Corrections Issued BEN MOLSTAD
Pre-Inspection 6/23/2025 Not Ready for Inspection BEN MOLSTAD
Excavation/Setback/Form/Re-Bar 7/1/2025 Corrections Issued BEN MOLSTAD
Pre-Inspection 7/1/2025 Approved BEN MOLSTAD
Excavation/Setback/Form/Re-Bar 7/2/2025 Corrections Issued BEN MOLSTAD
Pre-Inspection 7/2/2025 Approved BEN MOLSTAD
Excavation/Setback/Form/Re-Bar 7/10/2025 Partial Approval BEN MOLSTAD
Excavation/Setback/Form/Re-Bar 7/15/2025 Partial Approval BEN MOLSTAD
Deputy Methane Barrier 7/21/2025 Conditional Approval ANSON MAGLASANG
Excavation/Setback/Form/Re-Bar 7/21/2025 Approved BEN MOLSTAD
Floor/Roof Diaphrgm/Shear Wall 8/5/2025 Partial Approval BEN MOLSTAD
METHANE-Rough 8/5/2025 Approved BEN MOLSTAD
Verify Sprinkler Sign Off 8/5/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 8/5/2025 Not Ready for Inspection BEN MOLSTAD
Floor/Roof Diaphrgm/Shear Wall 8/20/2025 Partial Approval BEN MOLSTAD
Verify Sprinkler Sign Off 8/20/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 8/20/2025 Not Ready for Inspection BEN MOLSTAD
Verify Sprinkler Sign Off 8/26/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 8/26/2025 Not Ready for Inspection BEN MOLSTAD
Special/Order Compliance 9/3/2025 Corrections Issued JOSEPH MCGARRY
Wood Frame 9/3/2025 Corrections Issued JOSEPH MCGARRY
Verify Sprinkler Sign Off 9/12/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 9/12/2025 Corrections Issued BEN MOLSTAD
Verify Sprinkler Sign Off 9/16/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 9/16/2025 Corrections Issued BEN MOLSTAD
Verify Sprinkler Sign Off 9/19/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 9/19/2025 Not Ready for Inspection BEN MOLSTAD
Verify Sprinkler Sign Off 10/7/2025 Corrections Issued BEN MOLSTAD
Wood Frame 10/7/2025 Corrections Issued BEN MOLSTAD
Floor/Roof Diaphrgm/Shear Wall 10/9/2025 Not Ready for Inspection BEN MOLSTAD
Insulation 10/9/2025 Not Ready for Inspection BEN MOLSTAD
Interior/Exterior Lathing 10/9/2025 Not Ready for Inspection BEN MOLSTAD
Verify Sprinkler Sign Off 10/9/2025 Not Ready for Inspection BEN MOLSTAD
Wood Frame 10/9/2025 Not Ready for Inspection BEN MOLSTAD
Drywall Nailing 10/21/2025 Approved BEN MOLSTAD
Final 2/25/2026 OK to Issue CofO BEN MOLSTAD
Footing/Foundation/Slab 2/25/2026 Approved BEN MOLSTAD
METHANE-Barrier 2/25/2026 Approved BEN MOLSTAD
METHANE-Subgrade 2/25/2026 Approved BEN MOLSTAD
SGSOV-Seismic Gas S/O Valve 2/25/2026 SGSOV Approved BEN MOLSTAD
Smoke Detectors 2/25/2026 Approved BEN MOLSTAD
Verify Sprinkler Sign Off 2/25/2026 Approved BEN MOLSTAD
Wood Frame 2/25/2026 Approved BEN MOLSTAD