12747 W HATTERAS ST 91607

Certificate Information: 12747 W HATTERAS ST 91607

Application / Permit
24047-20000-00033
Plan Check / Job No.
B24VN00310
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
EPLAN: NEW 29' X 17' SWIMMING POOL WITH ATTACHED 9' X 9' SPA PER LA CITY STANDARD PLAN #268
Permit Issued
Issued on 4/4/2024
Issuing Office
Current Status
CofO Issued on 9/12/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/11/2024 APPLICANT
Assigned to Plan Check Engineer 1/11/2024 ALFRED RAMIREZ
Corrections Issued 1/11/2024 ALFRED RAMIREZ
Applicant returned to address corrections 3/21/2024 ALFRED RAMIREZ
Plan Check Approved 4/2/2024 GURUNATH NESARAJAH
Issued 4/4/2024 APPLICANT
CofO in Progress 8/29/2024 JACK KARGODORIAN
CofO Issued 9/12/2024 DANIEL ORRANTE
Permit Finaled 9/12/2024 DANIEL ORRANTE

Permit Application Clearance Information

Construction near power lines Cleared 3/27/2024 TINA MIRANDA
Construction within easement Cleared 3/27/2024 TINA MIRANDA

Contact Information

Contractor Exodus Construction & Remodeling Inc; Lic. No.: 1010959-B       ,
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Gas Piping or Gas Test 4/19/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Pool Piping 4/19/2024 Approved ROBERTO PALACIOS-LOPEZ
Pre-Gunite 4/19/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Deputy Shotcrete 4/22/2024 Corrections Issued JUAN VALENZUELA
Grounding or Bonding 6/4/2024 Approved OGANES TARAKHCHYAN
Enclosure/Fence 6/25/2024 Approved OGANES TARAKHCHYAN
Final 8/1/2024 No Access for Inspection OGANES TARAKHCHYAN
Pool Equipment Noise Test 8/1/2024 Approved ALFREDO FLORES
SGSOV-Seismic Gas S/O Valve 8/1/2024 SGSOV Not Ready OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 8/7/2024 Approved CHRISTOPHE COCHRAN
Final 8/7/2024 Corrections Issued CHRISTOPHE COCHRAN
Pre-Gunite 8/7/2024 Approved CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 8/7/2024 SGSOV Approved CHRISTOPHE COCHRAN
Final 8/22/2024 OK to Issue CofO JACK KARGODORIAN