3012 N ARROWHEAD DR 90068

Certificate Information: 3012 N ARROWHEAD DR 90068

Application / Permit
24047-10000-01802
Plan Check / Job No.
B24LA37182
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
REMODEL EXISTING POOL PER STANDARD PLAN 268 . RAISE THE POOL FLOOR WITHIN THE EXISTING SHELL, NEW SPA WITHIN EXISTING SHELL, NEW BAJA SHELF AND STEPS . INFILL A PORTION OF EXISTING POOL WITH UNCERTIFIED FILL (SLURRY) . AND REINFORCE AND LOWER SELECT EXISTING POOL WALLS AND BOND BEAMS PER ENGINEERED DESIGN .
Permit Issued
Issued on 1/23/2025
Issuing Office
Metro
Current Status
CofO Issued on 5/20/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/20/2024 APPLICANT
Assigned to Plan Check Engineer 12/20/2024 GEORGE ALVAREZ
Corrections Issued 12/20/2024 GEORGE ALVAREZ
Applicant returned to address corrections 1/21/2025 NEHEMIAS RAMOS
Plan Check Approved 1/23/2025 NEHEMIAS RAMOS
Issued 1/23/2025 APPLICANT
CofO in Progress 5/19/2025 BRIAN SULLIVAN
Permit Finaled 5/20/2025 DEROLD HAUFF
CofO Issued 5/20/2025 DEROLD HAUFF
Permit Finaled 5/20/2025 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 1/23/2025 GEORGE ALVAREZ

Contact Information

Contractor Lost West Pools; Lic. No.: 854278-C53 2629 WHITNEY DRIVE      ALHAMBRA, CA 91803
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grounding or Bonding 2/18/2025 Approved ROY SPAULDING
Pool Piping 2/18/2025 Partial Approval ROY SPAULDING
Pre-Gunite 2/21/2025 Approved BRIAN SULLIVAN
Deputy Shotcrete 2/25/2025 Conditional Approval BRIAN SULLIVAN
Grounding or Bonding 3/18/2025 Partial Approval CRAIG VAUGHAN
Enclosure/Fence 4/10/2025 Approved BRIAN SULLIVAN
Grounding or Bonding 4/10/2025 Partial Approval BRIAN SULLIVAN
Deck 4/17/2025 Approved BRIAN SULLIVAN
Equipment Noise Level 5/13/2025 Approved ANDEY CHAPARRO
Final 5/16/2025 OK to Issue CofO BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/16/2025 SGSOV Approved BRIAN SULLIVAN