3562 S VETERAN AVE 90034

Certificate Information: 3562 S VETERAN AVE 90034

Application / Permit
24016-90000-28258
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 11 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B. 2 bathroom(s).Bathroom remodel for residential buildings (no structural changes). 12 door(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B.
Permit Issued
Issued on 9/4/2024
Issuing Office
Current Status
Permit Finaled on 2/20/2025

Permit Application Status History

Issued 9/4/2024 INTERNET PERMIT
Permit Finaled 2/20/2025 EVAN COOPER

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Lozano Construction Inc; Lic. No.: 968956-B 3937 W. 105TH ST.      INGLEWOOD, CA 90303

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 9/19/2024 Approved DANIEL VERA
BUILDING-Rough-Frame 10/11/2024 Not Ready for Inspection DANIEL VERA
ELECTRICAL-Rough 10/11/2024 Approved DANIEL VERA
HVAC-Rough 10/11/2024 Corrections Issued DANIEL VERA
PLUMBING-Rough 10/11/2024 Approved DANIEL VERA
BUILDING-Rough-Frame 10/17/2024 Approved DANIEL VERA
HVAC-Rough 10/17/2024 Approved DANIEL VERA
Shower Pan 10/17/2024 Approved DANIEL VERA
Insulation 10/21/2024 Approved DANIEL VERA
Interior/Exterior Lathing 10/21/2024 Approved DANIEL VERA
PLUMBING-Rough 10/21/2024 Approved DANIEL VERA
Drywall Nailing 10/24/2024 Approved REGINA MENDEZ
ELECTRICAL-Final 1/30/2025 Approved EVAN COOPER
Final 1/30/2025 Corrections Issued EVAN COOPER
HVAC-Final 1/30/2025 Approved EVAN COOPER
PLUMBING-Final 1/30/2025 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 1/30/2025 SGSOV Not Ready EVAN COOPER
Smoke Detectors 1/30/2025 Approved EVAN COOPER
Final 2/20/2025 Permit Finaled EVAN COOPER