3434 S REDONDO BLVD 90016

Certificate Information: 3434 S REDONDO BLVD 90016

Application / Permit
24016-40000-23465
Plan Check / Job No.
X24SP02655
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing _18_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). AND 18--Window and 7--Door change-out (same size & type) for residential buildings. Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
Permit Issued
Issued on 7/23/2024
Issuing Office
San Pedro
Current Status
Permit Finaled on 12/6/2024

Permit Application Status History

Issued 7/23/2024 APPLICANT
Permit Finaled 12/3/2024 WILLIAM MICHALAK

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Burr David Construction Inc; Lic. No.: 1089065-B 16185 VALLEY SPRINGS ROAD      CHINO HILLS, CA 91709

Inspector Information

LUIS CORRAL, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
DONALD WONG, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
KIM DOEPPING, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
WILLIAM MICHALAK, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Final 8/1/2024 Not Ready for Inspection NICHOLAS LOPEZ
Interior/Exterior Lathing 8/1/2024 Approved NICHOLAS LOPEZ
SGSOV-Seismic Gas S/O Valve 8/1/2024 SGSOV Not Ready NICHOLAS LOPEZ
Smoke Detectors 8/1/2024 Corrections Issued NICHOLAS LOPEZ
Final 9/20/2024 Corrections Issued WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 9/20/2024 SGSOV Not Ready WILLIAM MICHALAK
Smoke Detectors 9/20/2024 Not Ready for Inspection WILLIAM MICHALAK
Final 10/16/2024 Not Ready for Inspection WILLIAM MICHALAK
Order to Comply 10/16/2024 OTC Issued WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 10/16/2024 SGSOV Not Ready WILLIAM MICHALAK
Smoke Detectors 10/16/2024 Partial Approval WILLIAM MICHALAK
Final 10/25/2024 Not Ready for Inspection WILLIAM MICHALAK
Order to Comply 10/25/2024 Not Required WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 10/25/2024 SGSOV Not Ready WILLIAM MICHALAK
Smoke Detectors 10/25/2024 Approved WILLIAM MICHALAK
Final 12/3/2024 Permit Finaled WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 12/3/2024 SGSOV Approved WILLIAM MICHALAK