3101 S BARRINGTON AVE 90066
Certificate Information: 3101 S BARRINGTON AVE 90066
- Application / Permit
- 24016-30000-39748
- Plan Check / Job No.
- X24WL09878
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing 228 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over NEW solid sheathing 152 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
- Permit Issued
- Issued on 12/18/2024
- Issuing Office
- Current Status
- Issued on 12/18/2024
Permit Application Status History
| No Progress | 12/17/2024 | KARENINA MORSHITA |
| Issued | 12/18/2024 | APPLICANT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | J S Frazer Inc; Lic. No.: 826718-B | 79915 COATBRIDGE COURT INDIO, CA 92203 |
Inspector Information
| FARHAD DADBIN, (310) 914-3922 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 1/17/2025 | Partial Approval | DANIEL VARNUM |
| Final | 2/5/2025 | Not Ready for Inspection | FARHAD DADBIN |
| Green Building Final | 2/5/2025 | Not Ready for Inspection | FARHAD DADBIN |
| SGSOV-Seismic Gas S/O Valve | 2/5/2025 | SGSOV Not Ready | FARHAD DADBIN |
| Smoke Detectors | 2/5/2025 | Not Ready for Inspection | FARHAD DADBIN |