1618 N SUNSET PLAZA DR 90069

Certificate Information: 1618 N SUNSET PLAZA DR 90069

Application / Permit
24016-30000-37484
Plan Check / Job No.
B24WL09268
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior and exterior alteration to (e) SFD w./ att. garage ; work includes remove and replace portion of roof deck and stair framing, change portion of roof envelope to flat roof and interior remodel
Permit Issued
Issued on 4/10/2025
Issuing Office
Valley
Current Status
Permit Finaled on 2/9/2026

Permit Application Status History

Submitted 11/25/2024 APPLICANT
Assigned to Plan Check Engineer 11/26/2024 REZA HAGHIGHAT
Corrections Issued 11/30/2024 REZA HAGHIGHAT
Quality Review Completed 12/6/2024 CHIHARU SUZUKI
Building Plans Picked Up 12/9/2024 APPLICANT
Plan Check Approved 1/21/2025 REZA HAGHIGHAT
Issued 4/10/2025 APPLICANT
Permit Finaled 2/9/2026 ROY SPAULDING

Permit Application Clearance Information

Grading Pre-Inspection Cleared 4/8/2025 REZA HAGHIGHAT

Contact Information

Contractor Racing Green Group Deep Grey Foundations; Lic. No.: 992206-B 13123 W WASHINGTON BLVD      LOS ANGELES, CA 90066

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/22/2025 Conditional Approval ROY SPAULDING
Deputy Wood Construction 5/22/2025 Conditional Approval ROY SPAULDING
ELECTRICAL-Rough 8/15/2025 Not Ready for Inspection ROY SPAULDING
HVAC-Rough 8/15/2025 Not Ready for Inspection ROY SPAULDING
PLUMBING-Rough 8/15/2025 Not Ready for Inspection ROY SPAULDING
Pre-Inspection 8/15/2025 Partial Inspection ROY SPAULDING
BUILDING-Rough-Frame 8/22/2025 Approved ROY SPAULDING
ELECTRICAL-Rough 8/22/2025 Approved ROY SPAULDING
HVAC-Rough 8/22/2025 Approved ROY SPAULDING
PLUMBING-Rough 8/22/2025 Approved ROY SPAULDING
Structural Steel Frame 8/22/2025 Approved ROY SPAULDING
Shower Pan 8/27/2025 Approved ROY SPAULDING
Insulation 8/28/2025 Approved ROY SPAULDING
Masonry Wall/Backfill 8/28/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 9/3/2025 Approved ROY SPAULDING
Drywall Nailing 9/17/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 10/22/2025 Partial Approval ROY SPAULDING
Interior/Exterior Lathing 12/11/2025 Approved SCOTT FINNILA
Wood Frame 12/11/2025 Approved SCOTT FINNILA
Interior/Exterior Lathing 12/15/2025 Approved ROY SPAULDING
Wood Frame 12/15/2025 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 2/3/2026 SGSOV Not Ready ROY SPAULDING
Pre-Inspection 2/5/2026 Partial Inspection ROY SPAULDING
ELECTRICAL-Final 2/9/2026 Approved ROY SPAULDING
Final 2/9/2026 Permit Finaled ROY SPAULDING
HVAC-Final 2/9/2026 Approved ROY SPAULDING
PLUMBING-Final 2/9/2026 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 2/9/2026 SGSOV Approved ROY SPAULDING
Smoke Detectors 2/9/2026 Approved ROY SPAULDING