254 N MABERY ROAD 90402

Certificate Information: 254 N MABERY ROAD 90402

Application / Permit
24016-30000-36683
Plan Check / Job No.
B24WL09066
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior alterations to a SFD w/ attached garage, remove portion of SFD at the rear
Permit Issued
Issued on 3/19/2025
Issuing Office
West Los Angeles
Current Status
CofO Issued on 2/2/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/15/2024 APPLICANT
Assigned to Plan Check Engineer 11/18/2024 KAVIAN REFAHI
Corrections Issued 11/19/2024 KAVIAN REFAHI
Building Plans Picked Up 12/2/2024 APPLICANT
Applicant returned to address corrections 3/7/2025 JOHNPAUL ISIP
Plan Check Approved 3/11/2025 JOHNPAUL ISIP
Issued 3/19/2025 APPLICANT
CofO in Progress 12/8/2025 HERBERT GIRON
Permit Finaled 2/2/2026 RICHARD STEINBACH
CofO Issued 2/2/2026 RICHARD STEINBACH
Permit Finaled 2/2/2026 RICHARD STEINBACH

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 12/24/2024 DIANA RENTERIA
Sewer availability Cleared 12/24/2024 DIANA RENTERIA
ZA Case Cleared 12/31/2024 NATHAN ROMINE
Eng Process Fee Ord 176,300 Cleared 1/16/2025 DARIN LAM
Coastal Zone Cleared 2/18/2025 NATHAN ROMINE
Hydrant and Access approval Cleared 2/25/2025 KURT CORRAL
Grading Pre-Inspection Cleared 3/4/2025 VASIL MIHALEV

Contact Information

Contractor Condev Construction Corp; Lic. No.: 762012-B 14720 VALERIO STRET      VAN NUYS, CA 91405
Engineer Christiansen,, Scott; Lic. No.: C37989 1003 WILSHIRE BLVD 202      SANTA MONICA, CA 90401

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/22/2025 Corrections Issued TEMISTOCLES CAAL
Footing/Foundation/Slab 4/22/2025 Corrections Issued TEMISTOCLES CAAL
ELECTRICAL-Rough 5/22/2025 Corrections Issued HERBERT GIRON
Footing/Foundation/Slab 5/22/2025 Approved HERBERT GIRON
PLUMBING-Rough 5/22/2025 Corrections Issued HERBERT GIRON
Deputy Drilled-In Anchors 5/23/2025 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 5/23/2025 Conditional Approval MICHAEL PELHAM
ELECTRICAL-Rough 5/30/2025 Approved ARAM AVEDISIAN
HVAC-Rough 5/30/2025 Corrections Issued ARAM AVEDISIAN
PLUMBING-Rough 5/30/2025 Corrections Issued ARAM AVEDISIAN
HVAC-Rough 6/2/2025 Approved HERBERT GIRON
Interior/Exterior Lathing 6/2/2025 Not Ready for Inspection HERBERT GIRON
PLUMBING-Rough 6/2/2025 Corrections Issued HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/3/2025 Corrections Issued HERBERT GIRON
PLUMBING-Rough 6/6/2025 Partial Approval HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/12/2025 Approved HERBERT GIRON
Insulation 6/12/2025 Partial Approval HERBERT GIRON
Interior/Exterior Lathing 6/24/2025 Partial Approval HERBERT GIRON
BUILDING-Rough-Frame 6/26/2025 Approved STEPHANIE SWANSON
Green Building Rough 6/26/2025 Approved STEPHANIE SWANSON
Insulation 6/26/2025 Approved STEPHANIE SWANSON
Shower Pan 6/30/2025 Approved HERBERT GIRON
Drywall Nailing 7/7/2025 Approved HERBERT GIRON
Interior/Exterior Lathing 7/7/2025 Approved HERBERT GIRON
ELECTRICAL-Final 11/20/2025 Corrections Issued HERBERT GIRON
Final 11/20/2025 Corrections Issued HERBERT GIRON
HVAC-Final 11/20/2025 Corrections Issued HERBERT GIRON
PLUMBING-Final 11/20/2025 Corrections Issued HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 11/20/2025 SGSOV Not Ready HERBERT GIRON
Smoke Detectors 11/20/2025 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 12/4/2025 Approved HERBERT GIRON
Final 12/4/2025 Corrections Issued HERBERT GIRON
Green Building Final 12/4/2025 Approved HERBERT GIRON
HVAC-Final 12/4/2025 Corrections Issued HERBERT GIRON
PLUMBING-Final 12/4/2025 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 12/4/2025 SGSOV Approved HERBERT GIRON
Smoke Detectors 12/4/2025 Approved HERBERT GIRON
Final 12/8/2025 OK to Issue CofO HERBERT GIRON
HVAC-Final 12/8/2025 Approved HERBERT GIRON