5070 W WASHINGTON BLVD 90016
Certificate Information: 5070 W WASHINGTON BLVD 90016
- Application / Permit
- 24016-30000-28047
- Plan Check / Job No.
- X24WL06739
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (11) Hotel
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___35___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B.
- Permit Issued
- Issued on 9/3/2024
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 8/19/2025
Permit Application Status History
| Issued | 9/3/2024 | APPLICANT |
| Permit Finaled | 8/19/2025 | CHRISTOPHER BLACKWOOD |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | All American Building Services; Lic. No.: 921499-B | PO BOX 802586 SANTA CLARITA, CA 91380 |
Inspector Information
| IAN BLINN, (213) 482-7361 | Office Hours: 7:00-8:00 AM MON-FRI |
| CHRISTOPHER BLACKWOOD, (213) 482-7361 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 1/22/2025 | Approved | CHRISTOPHER BLACKWOOD |
| Wood Frame | 1/22/2025 | Approved | CHRISTOPHER BLACKWOOD |
| Final | 2/5/2025 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| SGSOV-Seismic Gas S/O Valve | 2/5/2025 | SGSOV Not Ready | CHRISTOPHER BLACKWOOD |
| Smoke Detectors | 2/5/2025 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| Pre-Inspection | 3/13/2025 | Approved | MARTIN TAVITIAN |
| Final | 8/18/2025 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| SGSOV-Seismic Gas S/O Valve | 8/18/2025 | SGSOV Not Ready | CHRISTOPHER BLACKWOOD |
| Smoke Detectors | 8/18/2025 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| Final | 8/19/2025 | Permit Finaled | CHRISTOPHER BLACKWOOD |
| SGSOV-Seismic Gas S/O Valve | 8/19/2025 | SGSOV Approved | CHRISTOPHER BLACKWOOD |
| Smoke Detectors | 8/19/2025 | Approved | CHRISTOPHER BLACKWOOD |