17006 S HOOVER ST 90247
Certificate Information: 17006 S HOOVER ST 90247
- Application / Permit
- 24016-30000-10051
- Plan Check / Job No.
- X24WL02120
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___30___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. INCLUDING ATTACHED GARAGE
- Permit Issued
- Issued on 3/26/2024
- Issuing Office
- Current Status
- Permit Finaled on 7/12/2024
Permit Application Status History
| Issued | 3/26/2024 | APPLICANT |
| Permit Finaled | 7/12/2024 | JAMES CHAVEZ |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | All American Construction And Roofing Inc; Lic. No.: 1058455-C39 | 15500 ERWIN ST UNIT 1001 VAN NUYS, CA 91411 |
Inspector Information
| BEN MOLSTAD, (310) 732-4557 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 3/27/2024 | Approved | EUGENE CASSIDY |
| Floor/Roof Diaphrgm/Shear Wall | 3/29/2024 | Not Ready for Inspection | JAMES CHAVEZ |
| Final | 4/4/2024 | Corrections Issued | JAMES CHAVEZ |
| SGSOV-Seismic Gas S/O Valve | 4/4/2024 | SGSOV Not Ready | JAMES CHAVEZ |
| Smoke Detectors | 4/4/2024 | Not Ready for Inspection | JAMES CHAVEZ |
| Final | 5/8/2024 | Corrections Issued | JAMES CHAVEZ |
| SGSOV-Seismic Gas S/O Valve | 5/8/2024 | SGSOV Not Ready | JAMES CHAVEZ |
| Smoke Detectors | 5/8/2024 | Not Ready for Inspection | JAMES CHAVEZ |
| Final | 5/22/2024 | No Access for Inspection | JAMES CHAVEZ |
| SGSOV-Seismic Gas S/O Valve | 5/22/2024 | SGSOV Not Ready | JAMES CHAVEZ |
| Smoke Detectors | 5/22/2024 | No Access for Inspection | JAMES CHAVEZ |
| Final | 7/12/2024 | Permit Finaled | JAMES CHAVEZ |
| SGSOV-Seismic Gas S/O Valve | 7/12/2024 | SGSOV Approved | JAMES CHAVEZ |
| Smoke Detectors | 7/12/2024 | Approved | JAMES CHAVEZ |