3658 S CENTINELA AVE 90066
Certificate Information: 3658 S CENTINELA AVE 90066
- Application / Permit
- 24016-30000-06899
- Plan Check / Job No.
- X24WL01345
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- (2) Door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Dry rot repair less than 10% of replacement cost of residential buildings. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _(2)_Squares. Class A roof covering is required within a Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. Freestanding masonry fence constructed per Information Bulletin P/BC 2020-096 located in residential zones, maximum 6 feet height above grade, and not located in the required front yard or within 5 feet of the side street lot line of a reverse corner lot (subject to additional limitations of LAMC Section 12.22C20(f) and Information Bulletin P/ZC 2002-002).15. Repair of water, dry-rot damaged stairs in residential buildings (less than 10% of replacement cost of stairs).
- Permit Issued
- Issued on 2/29/2024
- Issuing Office
- West Los Angeles
- Current Status
- Issued on 2/29/2024
Permit Application Status History
| Issued | 2/29/2024 | APPLICANT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| FARHAD DADBIN, (310) 914-3922 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 12/2/2024 | Not Ready for Inspection | FARHAD DADBIN |
| SGSOV-Seismic Gas S/O Valve | 12/2/2024 | SGSOV Not Ready | FARHAD DADBIN |
| Smoke Detectors | 12/2/2024 | Not Ready for Inspection | FARHAD DADBIN |