1540 S BEVERLY DR 1-6 90035
Certificate Information: 1540 S BEVERLY DR 1-6 90035
- Application / Permit
- 24016-20000-40743
- Plan Check / Job No.
- X24VN27221
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing (10 ) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. Window (40 ) and door (40 ) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B. 7 Kitchen/bathroom (11 ) remodel for residential buildings (no structural changes).
- Permit Issued
- Issued on 12/31/2024
- Issuing Office
- Current Status
- Permit Closed on 7/15/2026
Permit Application Status History
| Issued | 12/31/2024 | APPLICANT |
| Permit Closed | 7/15/2026 | FARHAD DADBIN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Oracle Construction Services Inc; Lic. No.: 1090821-B | 1702 S ROBERTSON BLVD STE 267 LOS ANGELES, CA 90035 |
Inspector Information
| FARHAD DADBIN, (310) 914-3922 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 11/18/2025 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 11/18/2025 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 11/21/2025 | Corrections Issued | FARHAD DADBIN |
| Smoke Detectors | 11/21/2025 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 12/2/2025 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 12/2/2025 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 5/13/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 5/19/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 5/19/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 6/29/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 7/7/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 7/7/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Final | 7/14/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Smoke Detectors | 7/14/2026 | Not Ready for Inspection | FARHAD DADBIN |
| Special/Order Compliance | 7/15/2026 | Permit Closed | FARHAD DADBIN |