2277 W 31ST ST 90018
Certificate Information: 2277 W 31ST ST 90018
- Application / Permit
- 24016-20000-38038
- Plan Check / Job No.
- X24VN24476
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (1)Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (27)Squares. Class A roof covering is required within Very HighFire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. "COMPLY WITH DEPARTMENT ORDER effective date 09/19/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
- Permit Issued
- Issued on 1/23/2025
- Issuing Office
- Current Status
- Permit Finaled on 4/28/2025
Permit Application Status History
| No Progress | 12/2/2024 | DELIA ALONSO |
| Issued | 1/23/2025 | APPLICANT |
| Permit Finaled | 4/25/2025 | WILLIAM MICHALAK |
Permit Application Clearance Information
| HPOZ | Cleared | 1/8/2025 | DANIEL MATA |
Contact Information
| Contractor | Arc General Consctruction Corp ; Lic. No.: 1064059-B | 525 E 1ST AVE LA HABRA, CA 90631 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| SGSOV-Seismic Gas S/O Valve | 3/21/2025 | SGSOV Not Ready | WILLIAM MICHALAK |
| Final | 3/26/2025 | Partial Approval | WILLIAM MICHALAK |
| SGSOV-Seismic Gas S/O Valve | 3/26/2025 | SGSOV Not Ready | WILLIAM MICHALAK |
| Smoke Detectors | 3/26/2025 | Approved | WILLIAM MICHALAK |
| Final | 4/18/2025 | Not Ready for Inspection | WILLIAM MICHALAK |
| SGSOV-Seismic Gas S/O Valve | 4/18/2025 | SGSOV Not Ready | WILLIAM MICHALAK |
| Final | 4/25/2025 | Permit Finaled | WILLIAM MICHALAK |
| SGSOV-Seismic Gas S/O Valve | 4/25/2025 | SGSOV Approved | WILLIAM MICHALAK |