3959 N VAN HORNE AVE 90032

Certificate Information: 3959 N VAN HORNE AVE 90032

Application / Permit
24016-20000-30004
Plan Check / Job No.
B24VN17069
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) KITCHEN AND BATHROOM. CREATE A NEW PRIMARY BATHROOM AND CLOSET.
Permit Issued
Issued on 10/22/2024
Issuing Office
Valley
Current Status
Permit Finaled on 4/9/2025

Permit Application Status History

Submitted 9/19/2024 APPLICANT
Assigned to Plan Check Engineer 9/19/2024 MIROOSH KHACHATOORIAN
Corrections Issued 9/19/2024 MIROOSH KHACHATOORIAN
Plan Check Approved 10/10/2024 GIOVANNY CHAVEZ
Issued 10/22/2024 APPLICANT
Permit Finaled 4/8/2025 JOSH MEISTER

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/10/2024 MIROOSH KHACHATOORIAN

Contact Information

Contractor Elite Home Remodeling Inc; Lic. No.: 1016742-B 303 N GLENOAKS BLVD STE 200      BURBANK, CA 91502
Engineer Chaaya,, Danny Camille; Lic. No.: C45555 P O BOX 46341      LOS ANGELES, CA 90046

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/8/2024 Approved LILIANA PORTILLO
ELECTRICAL-Rough 12/16/2024 Corrections Issued LILIANA PORTILLO
HVAC-Rough 12/16/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 12/16/2024 Corrections Issued LILIANA PORTILLO
Wood Frame 12/16/2024 Not Ready for Inspection LILIANA PORTILLO
BUILDING-Rough-Frame 12/18/2024 Approved LILIANA PORTILLO
ELECTRICAL-Rough 12/18/2024 Approved LILIANA PORTILLO
PLUMBING-Rough 12/18/2024 Not Ready for Inspection LILIANA PORTILLO
Insulation 12/20/2024 Partial Approval ANTHONY RAMOS
Drywall Nailing 1/7/2025 Approved JOSH MEISTER
HVAC-Rough 1/7/2025 Approved JOSH MEISTER
PLUMBING-Rough 1/7/2025 Approved JOSH MEISTER
Shower Pan 1/7/2025 Not Ready for Inspection JOSH MEISTER
Interior/Exterior Lathing 1/14/2025 Approved LILIANA PORTILLO
Shower Pan 1/14/2025 Approved LILIANA PORTILLO
Final 4/8/2025 Permit Finaled JOSH MEISTER
SGSOV-Seismic Gas S/O Valve 4/8/2025 SGSOV Approved JOSH MEISTER
Smoke Detectors 4/8/2025 Approved JOSH MEISTER