5822 S VERMONT AVE 90044

Certificate Information: 5822 S VERMONT AVE 90044

Application / Permit
24016-20000-19958
Plan Check / Job No.
B24VN08659
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
Tenant Improvement in (e) CVS retail with pharmacy and replace existing RTU with similar in same location.
Permit Issued
Issued on 2/10/2025
Issuing Office
Current Status
Permit Finaled on 5/9/2025

Permit Application Status History

Submitted 6/24/2024 APPLICANT
Assigned to Plan Check Engineer 6/28/2024 LUKE GONZALES
Corrections Issued 7/1/2024 LUKE GONZALES
Applicant returned to address corrections 8/30/2024 LUKE GONZALES
Applicant returned to address corrections 12/18/2024 SAMUEL GONZALEZ
Plan Check Approved 12/25/2024 FERNANDO FLORES
Issued 2/10/2025 APPLICANT
Permit Finaled 5/6/2025 DARRYL ARNOLD

Permit Application Clearance Information

CPC Cleared 12/3/2024 RUBEN VASQUEZ
ZA Case Cleared 12/3/2024 RUBEN VASQUEZ
ZA Case Cleared 12/3/2024 RUBEN VASQUEZ
ZA Case Cleared 12/3/2024 RUBEN VASQUEZ
"D" conditions Cleared 12/12/2024 MANERI ROMAN
Community Plan Implem. Overlay Cleared 12/12/2024 MANERI ROMAN
Historic Resource Verification Cleared 12/12/2024 YASMINE BASHIRI
Redevelopment Project Area Cleared 12/12/2024 YASMINE BASHIRI

Contact Information

Architect Robidoux,, Douglas Eric; Lic. No.: C30757 LITTLE   1300 DOVE ST. STE. 100    NEWPORT BEACH, CA 92660
Contractor Rocon Building Interiors; Lic. No.: 845912-B       ,
Contractor Rocon Group Inc; Lic. No.: 845912-B       ,
Engineer Allen,, Thomas Christopher; Lic. No.: S5460 2 VENTURE, SUITE 200      IRVINE, CA 92618
Engineer Fateen,, Sal Eldin; Lic. No.: C25969 1130 E CYPRESS STREET      COVINA, CA 91724

Inspector Information

PAUL BAZERKANIAN, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
LUIS CCAMACHO, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
ALAN MORELOS, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Drywall Nailing 2/20/2025 Partial Approval ALFREDO LOPEZ
Light Gage Steel Frame 2/20/2025 Partial Inspection ALFREDO LOPEZ
T-Bar Ceiling 3/10/2025 Not Ready for Inspection RAFAEL CORTES
T-Bar Ceiling 3/12/2025 Approved ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 4/8/2025 SGSOV Not Ready ALFREDO LOPEZ
Final 4/11/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 4/11/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 4/11/2025 Conditional Approval DARRYL ARNOLD
Final 5/6/2025 Permit Finaled DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 5/6/2025 SGSOV No Gas DARRYL ARNOLD
Smoke Detectors 5/6/2025 Approved DARRYL ARNOLD