2362 N ALLVIEW TER EAST 90068

Certificate Information: 2362 N ALLVIEW TER EAST 90068

Application / Permit
24016-20000-19065
Plan Check / Job No.
X24VN06824
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Re-stucco for residential buildings. Kitchen/bathroom (1 ) remodel for residential buildings (no structural changes). Window (2 ) and door (2) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B.
Permit Issued
Issued on 6/11/2024
Issuing Office
Current Status
Permit Finaled on 10/1/2025

Permit Application Status History

Issued 6/11/2024 APPLICANT
Permit Finaled 9/30/2025 CRAIG VAUGHAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Ground Up Builders; Lic. No.: 911849-B 14545 VICTORY BLVD STE 601      VAN NUYS, CA 91411

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/10/2024 Not Ready for Inspection ROY SPAULDING
BUILDING-Rough-Frame 9/6/2024 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 9/6/2024 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 10/25/2024 Not Ready for Inspection CRAIG VAUGHAN
Wood Frame 10/25/2024 Partial Approval CRAIG VAUGHAN
BUILDING-Rough-Frame 3/12/2025 Not Ready for Inspection CRAIG VAUGHAN
ELECTRICAL-Rough 3/12/2025 Corrections Issued CRAIG VAUGHAN
HVAC-Rough 3/12/2025 Approved CRAIG VAUGHAN
PLUMBING-Rough 3/12/2025 Approved CRAIG VAUGHAN
BUILDING-Rough-Frame 3/25/2025 Approved CRAIG VAUGHAN
ELECTRICAL-Rough 3/25/2025 Approved CRAIG VAUGHAN
Interior/Exterior Lathing 3/25/2025 Partial Approval CRAIG VAUGHAN
BUILDING-Rough-Frame 3/26/2025 Approved CRAIG VAUGHAN
ELECTRICAL-Rough 3/26/2025 Approved CRAIG VAUGHAN
HVAC-Rough 3/26/2025 Approved CRAIG VAUGHAN
Interior/Exterior Lathing 3/26/2025 Partial Approval CRAIG VAUGHAN
PLUMBING-Rough 3/26/2025 Approved CRAIG VAUGHAN
Wood Frame 3/26/2025 Approved CRAIG VAUGHAN
Insulation 4/1/2025 Approved CRAIG VAUGHAN
Shower Pan 4/1/2025 Approved CRAIG VAUGHAN
Drywall Nailing 4/4/2025 Approved JOSH MEISTER
ELECTRICAL-Final 9/23/2025 Approved CRAIG VAUGHAN
Final 9/23/2025 Not Ready for Inspection CRAIG VAUGHAN
HVAC-Final 9/23/2025 Approved CRAIG VAUGHAN
PLUMBING-Final 9/23/2025 Approved CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 9/23/2025 SGSOV Not Ready CRAIG VAUGHAN
Smoke Detectors 9/23/2025 Approved CRAIG VAUGHAN
Final 9/30/2025 Permit Finaled CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 9/30/2025 SGSOV Approved CRAIG VAUGHAN