3947 S COOLIDGE AVE 90066

Certificate Information: 3947 S COOLIDGE AVE 90066

Application / Permit
24016-20000-17614
Plan Check / Job No.
B24VN07555
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) KITCHEN AND TWO BATHROOMS AND ENCLOSE THE (E) COVERED PORCH.
Permit Issued
Issued on 6/7/2024
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 2/19/2025

Permit Application Status History

Submitted 5/29/2024 APPLICANT
Assigned to Plan Check Engineer 5/29/2024 SERGIO MUNIZ
Corrections Issued 5/29/2024 SERGIO MUNIZ
Plan Check Approved 6/3/2024 ARAMIK SHAHMIRZAIAN
Issued 6/7/2024 APPLICANT
Permit Finaled 2/19/2025 BOBBY KEY

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Sheerin Construction And Development; Lic. No.: 864959-B 2205 WESTRIDGE ROAD      LOS ANGELES, CA 90049
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: C91046 5164 N RATON CIR      LONG BEACH, CA 90807

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/26/2024 Conditional Approval KENNETH NAGLE
Deputy Drilled-In Anchors 6/28/2024 Conditional Approval TEMISTOCLES CAAL
Footing/Foundation/Slab 6/28/2024 Corrections Issued TEMISTOCLES CAAL
Footing/Foundation/Slab 7/2/2024 Approved JESUS RODRIGUEZ
Special/Order Compliance 7/2/2024 Corrections Issued JESUS RODRIGUEZ
ELECTRICAL-Rough 8/21/2024 Approved JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 8/21/2024 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Rough 8/21/2024 Approved JESUS RODRIGUEZ
Deputy Wood Construction 8/29/2024 Conditional Approval JESUS PINEDA
Deputy Wood Construction 8/30/2024 Conditional Approval JESUS PINEDA
HVAC-Rough 9/12/2024 Approved JESUS PINEDA
Interior/Exterior Lathing 9/12/2024 Approved JESUS PINEDA
Shower Pan 9/12/2024 Approved JESUS PINEDA
BUILDING-Rough-Frame 9/17/2024 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 9/17/2024 Approved JESUS PINEDA
Insulation 9/17/2024 Approved JESUS PINEDA
Drywall Nailing 9/27/2024 Approved REGINA MENDEZ
Underground Mechanical 11/5/2024 Partial Inspection JESUS PINEDA
Final 2/5/2025 Corrections Issued JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 2/5/2025 SGSOV Approved JESUS PINEDA
Smoke Detectors 2/5/2025 Approved JESUS PINEDA
Final 2/19/2025 Permit Finaled BOBBY KEY