Work Description
PARITAL PILE AND GRADE BEAM UNDERPINNING. GARAGE FOUNDATION REPLACEMENT AND REPAIR OF (E) FRAMING PER ENG DETAIL. FUTURE DECK EXT FOUNDATION
Permit Issued
Issued on 1/15/2025
Issuing Office
Current Status
Issued on 1/15/2025

Permit Application Status History

Submitted 5/20/2024 APPLICANT
Assigned to Plan Check Engineer 5/23/2024 PETER MOSESIAN
Corrections Issued 5/25/2024 PETER MOSESIAN
Quality Review Completed 5/29/2024 OMID HEDAYAT
Building Plans Picked Up 5/31/2024 APPLICANT
Plan Check Approved 7/5/2024 PETER MOSESIAN
Issued 1/15/2025 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/5/2024 PETER MOSESIAN

Contact Information

Contractor Alpha Structural Inc; Lic. No.: 663409-B 8334 FOOTHILL BLVD      SUNLAND, CA 91040
Engineer Aparicio,, Daniel Gonzalo; Lic. No.: C92121 19332 AVENIDA DEL SOL      WALNUT, CA 91789
Engineer Hamilton,, David; Lic. No.: GE2721 1641 BORDER AVE      TORRANCE, CA 90501

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/5/2025 Not Ready for Inspection JESUS RODRIGUEZ
Pre-Inspection 2/11/2025 No Access for Inspection KENNETH NAGLE
Deputy Other (see comments) 3/6/2025 No Access for Inspection MATTHEW JENKINS
Excavation/Setback/Form/Re-Bar 3/6/2025 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 3/10/2025 Not Ready for Inspection HERBERT GIRON
Excavation/Setback/Form/Re-Bar 3/12/2025 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 3/25/2025 Not Ready for Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 3/26/2025 Corrections Issued KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 3/27/2025 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 4/8/2025 Approved KEVIN SARGSYAN
Wood Frame 4/8/2025 Corrections Issued KEVIN SARGSYAN
Deputy Reinf. Concrete 4/9/2025 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 5/28/2025 Corrections Issued KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/28/2025 SGSOV Not Ready KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/2/2025 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/4/2025 Corrections Issued CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 6/5/2025 Approved KEVIN SARGSYAN