762 N RIDGEWOOD PL #3 90038

Certificate Information: 762 N RIDGEWOOD PL #3 90038

Application / Permit
24016-20000-15584
Plan Check / Job No.
B24VN06597
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
INTERIOR REMODEL FOR EXISTING UNIT 3. WORK TO INCLUDE REMOVE AND REPLACE OF DRYWALL, KITCHEN CABINETS, BATHROOM SINK, TUB, TOILET AND INSULATION - NO CHANGE IN STRUCTURAL
Permit Issued
Issued on 5/10/2024
Issuing Office
Valley
Current Status
Permit Finaled on 6/2/2025

Permit Application Status History

Submitted 5/10/2024 APPLICANT
Assigned to Plan Check Engineer 5/10/2024 DANIEL ABRAMYAN
Issued 5/10/2024 APPLICANT
Permit Finaled 5/29/2025 TIMOTHY POWELL

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/16/2024 Approved TIMOTHY POWELL
Wood Frame 9/18/2024 Not Ready for Inspection TIMOTHY POWELL
Wood Frame 9/23/2024 Partial Approval LUIS CCAMACHO
Insulation 10/15/2024 Approved RAFAEL CORTES
Drywall Nailing 10/24/2024 Partial Approval LUIS CCAMACHO
Drywall Nailing 10/30/2024 Approved TIMOTHY POWELL
Wood Frame 11/13/2024 Partial Approval LUIS CCAMACHO
Final 4/23/2025 Partial Inspection TIMOTHY POWELL
SGSOV-Seismic Gas S/O Valve 4/23/2025 SGSOV Not Ready TIMOTHY POWELL
Smoke Detectors 4/23/2025 Approved TIMOTHY POWELL
Final 5/16/2025 Not Ready for Inspection ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 5/16/2025 SGSOV Not Ready ALFREDO LOPEZ
Final 5/29/2025 Permit Finaled TIMOTHY POWELL
SGSOV-Seismic Gas S/O Valve 5/29/2025 SGSOV Approved TIMOTHY POWELL