3351 N WRIGHTWOOD DR 91604

Certificate Information: 3351 N WRIGHTWOOD DR 91604

Application / Permit
24016-20000-14730
Plan Check / Job No.
X24VN05128
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1 Kitchen/bathroom (3 ) remodel for residential buildings (no structural changes). Door (2 ) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b) 1B. Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one and two-family dwellings).
Permit Issued
Issued on 5/3/2024
Issuing Office
Valley
Current Status
Permit Finaled on 8/29/2024

Permit Application Status History

Issued 5/3/2024 APPLICANT
Permit Finaled 8/29/2024 CHRISTOPHE COCHRAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Ghazal Construction; Lic. No.: 1088805-B 15705 VOSE ST APT 100      VAN NUYS, CA 91406

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/6/2024 Corrections Issued CHRISTOPHE COCHRAN
Pre-Inspection 5/6/2024 Corrections Issued CHRISTOPHE COCHRAN
Shower Pan 5/6/2024 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 5/16/2024 Approved CHRISTOPHE COCHRAN
Rough-Elec/Plmb/HVAC 5/16/2024 Approved CHRISTOPHE COCHRAN
HVAC-Rough 7/5/2024 Approved CHRISTOPHE COCHRAN
Pre-Inspection 7/5/2024 Corrections Issued CHRISTOPHE COCHRAN
Pool Piping 7/10/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Pool Piping 7/11/2024 Approved CHRISTOPHE COCHRAN
Final 8/24/2024 Corrections Issued JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 8/24/2024 SGSOV Not Ready JUAN VALENZUELA
Smoke Detectors 8/24/2024 Approved JUAN VALENZUELA
Final 8/29/2024 Permit Finaled CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 8/29/2024 SGSOV Approved CHRISTOPHE COCHRAN