3949 S COOLIDGE AVE 90066

Certificate Information: 3949 S COOLIDGE AVE 90066

Application / Permit
24016-20000-13653
Plan Check / Job No.
B24VN05628
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE INTO ACCESSORY DWELLING UNIT PER LAMC 12.22A.33(c) & (d).
Permit Issued
Issued on 10/28/2024
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/2/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/24/2024 APPLICANT
Assigned to Plan Check Engineer 5/2/2024 HAYATO TSUCHIYA
Corrections Issued 5/2/2024 HAYATO TSUCHIYA
Building Plans Picked Up 5/6/2024 APPLICANT
Applicant returned to address corrections 5/29/2024 GIOVANNY CHAVEZ
Plan Check Approved 9/27/2024 SARKIS HARABEDIAN
Plan Check Approved 9/27/2024 ELIZABETH CRUZ
Issued 10/28/2024 APPLICANT
CofO in Progress 5/1/2025 MICHAEL ALLEN
Permit Finaled 5/2/2025 RICHARD STEINBACH
CofO Issued 5/2/2025 RICHARD STEINBACH
Permit Finaled 5/2/2025 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 5/10/2024 DARIN LAM
Sewer availability Cleared 5/10/2024 DARIN LAM
Eng Process Fee Ord 176,300 Cleared 5/13/2024 DARIN LAM
Specific Plan Cleared 7/11/2024 EDUARDO HERMOSO
Construction near power lines Cleared 9/25/2024 RIDWAN HARDY

Contact Information

Contractor Sheerin Construction And Development; Lic. No.: 864959-B 2205 WESTRIDGE ROAD      LOS ANGELES, CA 90049
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: C91046 5164 N RATON CIR      LONG BEACH, CA 90807

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/18/2024 Partial Inspection JESUS PINEDA
PLUMBING-Rough 11/18/2024 Partial Approval JESUS PINEDA
Sewer 11/18/2024 Approved JESUS PINEDA
Underground Mechanical 11/18/2024 Partial Approval JESUS PINEDA
Excavation/Setback/Form/Re-Bar 11/22/2024 Approved JESUS PINEDA
ELECTRICAL-Rough 12/2/2024 Partial Inspection JESUS PINEDA
Underground Mechanical 12/2/2024 Partial Approval JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 1/3/2025 Corrections Issued JESUS PINEDA
Insulation 1/3/2025 Partial Inspection JESUS PINEDA
ELECTRICAL-Rough 1/17/2025 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 1/17/2025 Not Ready for Inspection JESUS PINEDA
HVAC-Rough 1/17/2025 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 1/27/2025 Approved JESUS PINEDA
Interior/Exterior Lathing 1/27/2025 Partial Approval JESUS PINEDA
PLUMBING-Rough 1/27/2025 Corrections Issued JESUS PINEDA
BUILDING-Rough-Frame 1/29/2025 Approved JESUS PINEDA
Green Building Rough 1/29/2025 Approved JESUS PINEDA
PLUMBING-Rough 1/29/2025 Approved JESUS PINEDA
Insulation 2/5/2025 Approved JESUS PINEDA
Drywall Nailing 2/14/2025 Approved JESUS PINEDA
Interior/Exterior Lathing 3/13/2025 Approved JESUS PINEDA
Shower Pan 3/13/2025 Approved JESUS PINEDA
Final 4/14/2025 Corrections Issued MICHAEL ALLEN
Gas Test 4/14/2025 Approved MICHAEL ALLEN
Green Building Final 4/14/2025 Approved MICHAEL ALLEN
SGSOV-Seismic Gas S/O Valve 4/14/2025 SGSOV Not Ready MICHAEL ALLEN
Smoke Detectors 4/14/2025 Conditional Approval MICHAEL ALLEN
ELECTRICAL-Final 4/24/2025 Approved MICHAEL ALLEN
Final 4/24/2025 Corrections Issued MICHAEL ALLEN
HVAC-Final 4/24/2025 Approved MICHAEL ALLEN
PLUMBING-Final 4/24/2025 Approved MICHAEL ALLEN
SGSOV-Seismic Gas S/O Valve 4/24/2025 SGSOV Approved MICHAEL ALLEN
Smoke Detectors 4/24/2025 Approved MICHAEL ALLEN
Final 4/30/2025 OK to Issue CofO MICHAEL ALLEN