4544 N TALOFA AVE 91602

Certificate Information: 4544 N TALOFA AVE 91602

Application / Permit
24016-20000-11926
Plan Check / Job No.
B24VN04801
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
eplan Replace a bearing wall with a steel beam and converting existing roof (190 SQFT) to a new deck with interior remodel in existing single family dewlling with attached garage (no chanage in floor area, height)
Permit Issued
Issued on 7/2/2024
Issuing Office
Current Status
Issued on 7/2/2024

Permit Application Status History

Submitted 4/12/2024 APPLICANT
Assigned to Plan Check Engineer 4/17/2024 AUNG SOE
Corrections Issued 4/19/2024 AUNG SOE
Applicant returned to address corrections 5/21/2024 NGHI SU
Applicant returned to address corrections 6/12/2024 NGHI SU
Applicant returned to address corrections 6/18/2024 ZAW HAN
Applicant returned to address corrections 6/26/2024 AUNG SOE
Plan Check Approved 6/30/2024 AUNG SOE
Issued 7/2/2024 APPLICANT

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Basseri Engineering & Construction; Lic. No.: 724559-B       ,
Engineer Basseri,, Siavash M; Lic. No.: C45487 5250 W CENTURY BLVD STE 300      LOS ANGELES, CA 90045

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/6/2024 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 8/12/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 8/12/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Excavation/Setback/Form/Re-Bar 8/15/2024 Partial Approval JOSE AVILA
Footing/Foundation/Slab 8/15/2024 Partial Approval JOSE AVILA
Deputy Reinf. Concrete 8/21/2024 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 8/21/2024 Approved JOSE AVILA
Footing/Foundation/Slab 8/21/2024 Approved JOSE AVILA
ELECTRICAL-Rough 9/27/2024 Corrections Issued JOSE AVILA
PLUMBING-Rough 9/27/2024 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 10/15/2024 Not Ready for Inspection JOSE AVILA
HVAC-Rough 10/15/2024 Not Ready for Inspection JOSE AVILA
PLUMBING-Rough 10/15/2024 Not Ready for Inspection JOSE AVILA
ELECTRICAL-Rough 10/22/2024 Approved JOSE AVILA
PLUMBING-Rough 10/22/2024 Approved JOSE AVILA
HVAC-Rough 11/12/2024 Approved JOSE AVILA
Wood Frame 11/12/2024 Corrections Issued JOSE AVILA
Interior/Exterior Lathing 11/18/2024 Partial Approval JOSE AVILA
Wood Frame 11/18/2024 Corrections Issued JOSE AVILA
Drywall Nailing 12/10/2024 Approved JOSE AVILA
Wood Frame 12/10/2024 Approved JOSE AVILA
ELECTRICAL-Final 1/29/2025 Not Ready for Inspection MISAEL ESPARZA
HVAC-Final 1/29/2025 Not Ready for Inspection MISAEL ESPARZA
Smoke Detectors 1/29/2025 Not Ready for Inspection MISAEL ESPARZA
ELECTRICAL-Final 5/19/2025 Corrections Issued JOSE AVILA
HVAC-Final 5/19/2025 Not Ready for Inspection JOSE AVILA
ELECTRICAL-Final 6/5/2025 Not Ready for Inspection JOSE AVILA
PLUMBING-Final 6/5/2025 Approved JOSE AVILA
BUILDING-Rough-Frame 10/1/2025 Approved JOSE AVILA
ELECTRICAL-Final 10/1/2025 Approved JOSE AVILA
Final 10/1/2025 Corrections Issued JOSE AVILA
HVAC-Final 10/1/2025 Approved JOSE AVILA
MERV13>=Final 10/1/2025 Approved JOSE AVILA
MERV13>=Rough 10/1/2025 Approved JOSE AVILA
PLUMBING-Final 10/1/2025 Corrections Issued JOSE AVILA
SGSOV-Seismic Gas S/O Valve 10/1/2025 SGSOV Not Ready JOSE AVILA
Smoke Detectors 10/1/2025 Approved JOSE AVILA