6426 N BAKMAN AVE 91606

Certificate Information: 6426 N BAKMAN AVE 91606

Application / Permit
24016-20000-05166
Plan Check / Job No.
B24VN02083
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: CONVERT (E) DETACHED STORAGE TO AN ADU. PER GCS 65852.2(e)(1)(A). PER ENGINEERING DESIGN.
Permit Issued
Issued on 9/27/2024
Issuing Office
Current Status
Issued on 9/27/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/16/2024 APPLICANT
Assigned to Plan Check Engineer 2/22/2024 MIROOSH KHACHATOORIAN
Corrections Issued 2/23/2024 MIROOSH KHACHATOORIAN
Applicant returned to address corrections 7/25/2024 ALFREDO JARA
Plan Check Approved 8/3/2024 ALFREDO JARA
Issued 9/27/2024 APPLICANT

Permit Application Clearance Information

ZA Case Cleared 2/27/2024 JAZMIN ROQUE
Address approval Cleared 2/28/2024 MARKOS PEREZ-BRAN
Roof/Waste drainage to street Cleared 2/28/2024 MARKOS PEREZ-BRAN
Sewer availability Cleared 2/28/2024 MARKOS PEREZ-BRAN
Eng Process Fee Ord 176,300 Cleared 2/29/2024 MARKOS PEREZ-BRAN
Construction near power lines Cleared 7/15/2024 RIDWAN HARDY
Construction within easement Cleared 7/15/2024 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Kim,, Hong Kook; Lic. No.: C64529 3600 WILSHIRE BLVD STE 1903      LOS ANGELES, CA 90010

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 10/21/2024 Partial Approval ROBERTO PALACIOS-LOPEZ
Sewer 10/21/2024 Approved ROBERTO PALACIOS-LOPEZ
Deputy Drilled-In Anchors 10/23/2024 Conditional Approval JUAN VALENZUELA
Deputy Other (see comments) 10/23/2024 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 10/28/2024 Corrections Issued JENNIFER RABUCHIN
Footing/Foundation/Slab 10/31/2024 Corrections Issued JOSE AVILA
Deputy Drilled-In Anchors 11/12/2024 Conditional Approval ROBERT GOLD
Excavation/Setback/Form/Re-Bar 11/12/2024 Partial Approval JOSE AVILA
Footing/Foundation/Slab 11/19/2024 Not Ready for Inspection JOSE AVILA
Excavation/Setback/Form/Re-Bar 11/20/2024 Approved JOSE AVILA
Deputy Drilled-In Anchors 12/5/2024 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 12/9/2024 Approved JOSE AVILA
ELECTRICAL-Rough 1/27/2025 Corrections Issued MISAEL ESPARZA
PLUMBING-Rough 1/27/2025 Corrections Issued MISAEL ESPARZA
BUILDING-Rough-Frame 1/29/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 1/29/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 2/5/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 2/5/2025 Approved ROBERTO PALACIOS-LOPEZ
Underground Mechanical 2/5/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 2/12/2025 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 3/4/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Rough 3/4/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 3/4/2025 Approved ROBERTO PALACIOS-LOPEZ
Reinforced Masonry Frame 3/4/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Rough 4/10/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Reinforced Masonry Frame 4/10/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Rough 4/30/2025 Approved ROBERTO PALACIOS-LOPEZ
Reinforced Masonry Frame 4/30/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 5/15/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 5/15/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Green Building Rough 5/15/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Reinforced Masonry Frame 5/15/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 6/23/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Reinforced Masonry Frame 6/23/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 9/3/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 9/3/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 10/14/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 10/14/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 10/22/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 10/22/2025 Conditional Approval ROBERTO PALACIOS-LOPEZ
Green Building Rough 10/22/2025 Approved ROBERTO PALACIOS-LOPEZ
Insulation 11/4/2025 Corrections Issued JAVIER RAMOS JR
BUILDING-Rough-Frame 11/6/2025 Approved ROBERTO PALACIOS-LOPEZ
Insulation 11/6/2025 Approved ROBERTO PALACIOS-LOPEZ
Drywall Nailing 11/14/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Interior/Exterior Lathing 11/14/2025 Approved ROBERTO PALACIOS-LOPEZ
Shower Pan 11/14/2025 Approved ROBERTO PALACIOS-LOPEZ
Drywall Nailing 2/6/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Gas Test 2/6/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Service/Power Release 2/6/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Underground Mechanical 2/6/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ