923 W BLOOM WALK 90089

Certificate Information: 923 W BLOOM WALK 90089

Application / Permit
24016-20000-02534
Plan Check / Job No.
B24VN00996
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Educational Institution
Work Description
ePlan Interior Renovation of approximately 735 Gross-Square-Feet (GSF) to create a large Teaching Lab on the Third Floor of the Neely Petroleum Engineering Building (PCE) at USC University Park Campus. The existing spaces (Lab, Storage Room) will be demolished, and the space will be renovated.
Permit Issued
Issued on 6/11/2024
Issuing Office
Current Status
Permit Finaled on 8/22/2024

Permit Application Status History

Submitted 1/25/2024 APPLICANT
Assigned to Plan Check Engineer 1/25/2024 ZAW HAN
Corrections Issued 1/26/2024 ZAW HAN
Plan Check Approved 2/18/2024 ZAW HAN
Issued 6/11/2024 APPLICANT
Permit Finaled 8/22/2024 ALFREDO LOPEZ

Permit Application Clearance Information

City Hist. Cultural Monument Cleared 2/9/2024 LAMBERT GIESSINGER
Historic monument Cleared 2/9/2024 LAMBERT GIESSINGER
Specific Plan Cleared 2/12/2024 MANERI ROMAN

Contact Information

Architect Smith,, John David; Lic. No.: C38384 2712 W 36TH STREET      LOS ANGELES, CA 90018
Contractor Kizyma Enterprises Inc; Lic. No.: 510939-B       ,

Inspector Information

PAUL BAZERKANIAN, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
LUIS CCAMACHO, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
ALAN MORELOS, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Light Gage Steel Frame 7/23/2024 Not Ready for Inspection ALFREDO LOPEZ
Light Gage Steel Frame 7/26/2024 Approved ALFREDO LOPEZ
Drywall Nailing 7/27/2024 Off-Hour Fees Due
Drywall Nailing 7/29/2024 Approved ALFREDO LOPEZ
Drywall Nailing 7/29/2024 Off-Hour Fees Due
Insulation 7/29/2024 Approved ALFREDO LOPEZ
Final 8/22/2024 Permit Finaled ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 8/22/2024 SGSOV Approved ALFREDO LOPEZ
Smoke Detectors 8/22/2024 Approved ALFREDO LOPEZ