8334 S WINSFORD AVE 90045

Certificate Information: 8334 S WINSFORD AVE 90045

Application / Permit
24016-20000-01724
Plan Check / Job No.
B24VN00700
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
TO ENCLOSE AND CONVERT PORTION OF COVERED PORCH TO (E) SINGLE FAMILY DWELLING. INTERIOR REMODEL TO ADD A BEDROOM, TO RELOCATE KITCHEN, TO REPLACE AND CHANGE WINDOWS, ADD MULTIPLE WINDOWS AND DOOR.
Permit Issued
Issued on 2/20/2024
Issuing Office
Valley
Current Status
Permit Finaled on 1/14/2025

Permit Application Status History

Submitted 1/19/2024 APPLICANT
Assigned to Plan Check Engineer 1/19/2024 GIOVANNY CHAVEZ
Corrections Issued 1/19/2024 GIOVANNY CHAVEZ
Applicant returned to address corrections 2/7/2024 GIOVANNY CHAVEZ
Issued 2/20/2024 APPLICANT
Permit Finaled 1/13/2025 TEMISTOCLES CAAL

Permit Application Clearance Information

Sewer availability Cleared 1/23/2024 DARIN LAM
Grading Pre-Inspection Cleared 1/25/2024 VASIL MIHALEV
Eng Process Fee Ord 176,300 Cleared 1/30/2024 DARIN LAM

Contact Information

Contractor P M A Renovations; Lic. No.: 1033506-B 17941 VENTURA BLVD #204      ENCINO, CA 91316
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/22/2024 Conditional Approval BOBBY KEY
Deputy Drilled-In Anchors 3/26/2024 Conditional Approval BOBBY KEY
BUILDING-Rough-Frame 4/9/2024 Corrections Issued BOBBY KEY
HVAC-Rough 4/9/2024 Approved BOBBY KEY
PLUMBING-Rough 4/9/2024 Approved BOBBY KEY
Shower Pan 4/11/2024 Approved BOBBY KEY
ELECTRICAL-Rough 4/15/2024 Approved BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 4/15/2024 Partial Approval BOBBY KEY
Interior/Exterior Lathing 4/15/2024 Partial Approval BOBBY KEY
Special/Order Compliance 4/15/2024 Corrections Issued BOBBY KEY
BUILDING-Rough-Frame 5/2/2024 Partial Approval BOBBY KEY
Interior/Exterior Lathing 5/2/2024 Not Ready for Inspection BOBBY KEY
Interior/Exterior Lathing 5/8/2024 Partial Approval BOBBY KEY
Insulation 5/10/2024 Approved BOBBY KEY
Deputy Drilled-In Anchors 5/15/2024 Conditional Approval RICHARD STEINBACH
Deputy Wood Construction 5/21/2024 Conditional Approval BOBBY KEY
BUILDING-Rough-Frame 5/22/2024 Approved BOBBY KEY
Deputy Wood Construction 5/22/2024 Approved BOBBY KEY
Drywall Nailing 5/30/2024 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 11/18/2024 SGSOV Not Ready BOBBY KEY
Final 11/21/2024 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 11/21/2024 SGSOV Not Ready BOBBY KEY
Smoke Detectors 11/21/2024 Approved BOBBY KEY
Final 12/4/2024 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 12/4/2024 SGSOV Not Ready BOBBY KEY
Final 1/13/2025 Permit Finaled TEMISTOCLES CAAL
SGSOV-Seismic Gas S/O Valve 1/13/2025 SGSOV Approved TEMISTOCLES CAAL