4034 N WITZEL DR 91423

Certificate Information: 4034 N WITZEL DR 91423

Application / Permit
24016-20000-00927
Plan Check / Job No.
B24VN00364
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED INT/EXT REMODEL, REMOVE & REPLACE EXISTING WINDOWS/DOORS & REFRAME PORTION OF (E) ROOF, 2'-6" X 28'-6" COVERED OVERHANG AND 4'-6" X 28'-6" TRELLIS OVERHANG ADDITION OVER EXISTING DECK. ALL WORK PER ENG.
Permit Issued
Issued on 3/11/2024
Issuing Office
Valley
Current Status
Permit Finaled on 2/20/2025

Permit Application Status History

Submitted 1/10/2024 APPLICANT
Assigned to Plan Check Engineer 1/17/2024 HAYATO TSUCHIYA
Corrections Issued 1/19/2024 HAYATO TSUCHIYA
Building Plans Picked Up 1/23/2024 APPLICANT
Plan Check Approved 2/26/2024 LUISANGEL VALENZUELA
Issued 3/11/2024 APPLICANT
Permit Finaled 2/19/2025 MISAEL ESPARZA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/26/2024 HAYATO TSUCHIYA

Contact Information

Contractor Owner-Builder       ,
Engineer Arakelyan,, Aram; Lic. No.: C82796 145 S GLENOAKS BI 328      BURBANK, CA 91502

Inspector Information

MISAEL ESPARZA, (818) 374-1169 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/2/2024 Conditional Approval ROBERT GOLD
Green Building Rough 8/15/2024 Not Ready for Inspection MISAEL ESPARZA
Wood Frame 8/15/2024 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 10/3/2024 Not Ready for Inspection MISAEL ESPARZA
Green Building Rough 10/3/2024 Not Ready for Inspection MISAEL ESPARZA
Insulation 10/3/2024 Approved MISAEL ESPARZA
Wood Frame 10/3/2024 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 10/16/2024 Approved MISAEL ESPARZA
Green Building Rough 10/16/2024 Not Ready for Inspection MISAEL ESPARZA
Wood Frame 10/16/2024 Approved MISAEL ESPARZA
Interior/Exterior Lathing 10/23/2024 Approved MISAEL ESPARZA
Drywall Nailing 12/12/2024 Approved MISAEL ESPARZA
Final 1/22/2025 Not Ready for Inspection MISAEL ESPARZA
Footing/Foundation/Slab 1/22/2025 Approved MISAEL ESPARZA
Green Building Final 1/22/2025 Approved MISAEL ESPARZA
Green Building Rough 1/22/2025 Approved MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 1/22/2025 SGSOV Approved MISAEL ESPARZA
Smoke Detectors 1/22/2025 Approved MISAEL ESPARZA
Wood Frame 1/22/2025 Approved MISAEL ESPARZA
Final 2/19/2025 Permit Finaled MISAEL ESPARZA