3159 S IVY ST 90034

Certificate Information: 3159 S IVY ST 90034

Application / Permit
24016-10000-37478
Plan Check / Job No.
B24LA33402
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL OF EXISTING SINGLE FAMILY DWELLING TO CONVERT EXISTING LIVING SPACE TO THE NEW MASTER BEDROOM AND BATHROOM, CONVERT AN EXISTING BEDROOM TO LIVING SPACE, RENOVATE THE EXISTING KITCHEN AND ONE BATHROOM, AND REMOVE AND ADD SEVERAL WINDOWS. ALL WORK DONE PER WFPP.
Permit Issued
Issued on 2/5/2025
Issuing Office
Current Status
Permit Finaled on 8/1/2025

Permit Application Status History

Submitted 11/25/2024 APPLICANT
Assigned to Plan Check Engineer 11/26/2024 MADISON ODELL
Corrections Issued 11/26/2024 MADISON ODELL
Applicant returned to address corrections 12/18/2024 GIOVANNY CHAVEZ
Applicant returned to address corrections 1/8/2025 MADISON ODELL
Applicant returned to address corrections 1/18/2025 MADISON ODELL
Applicant returned to address corrections 1/24/2025 MADISON ODELL
Plan Check Approved 2/3/2025 MADISON O'DELL
Issued 2/5/2025 APPLICANT
Permit Finaled 8/1/2025 EVAN COOPER

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 1/22/2025 ISAIAH ROSS
Specific Plan Cleared 1/27/2025 JULISSA LOPEZ-HODOYAN

Contact Information

Contractor Owner-Builder       ,

Inspector Information

WILBER ROSALES, (310) 914-3892 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 3/3/2025 Corrections Issued ARAM AVEDISIAN
MERV13>=Rough 3/3/2025 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 3/28/2025 Corrections Issued EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 3/28/2025 Not Ready for Inspection EVAN COOPER
Interior/Exterior Lathing 3/28/2025 Partial Approval EVAN COOPER
PLUMBING-Rough 3/28/2025 Corrections Issued EVAN COOPER
ELECTRICAL-Rough 4/9/2025 Not Ready for Inspection EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 4/9/2025 Approved EVAN COOPER
PLUMBING-Rough 4/9/2025 Approved EVAN COOPER
ELECTRICAL-Rough 5/9/2025 Corrections Issued ARAM AVEDISIAN
BUILDING-Rough-Frame 5/14/2025 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 5/14/2025 Approved ARAM AVEDISIAN
HVAC-Rough 5/19/2025 Approved ARAM AVEDISIAN
Insulation 5/19/2025 Approved ARAM AVEDISIAN
Drywall Nailing 5/22/2025 Partial Approval ARAM AVEDISIAN
Shower Pan 5/22/2025 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 5/27/2025 Corrections Issued BOBBY KEY
Drywall Nailing 5/28/2025 Approved BOBBY KEY
Pre-Inspection 7/7/2025 Partial Inspection WILBER ROSALES
Final 8/1/2025 Permit Finaled EVAN COOPER
MERV13>=Final 8/1/2025 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 8/1/2025 SGSOV Approved EVAN COOPER
Smoke Detectors 8/1/2025 Approved EVAN COOPER