3455 N ARROYO SECO AVE 90065

Certificate Information: 3455 N ARROYO SECO AVE 90065

Application / Permit
24016-10000-35238
Plan Check / Job No.
B24LA30365
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan: Remodel and repair of SFD unit with address: 3455. Remodel and repair, Replacement of existing and interior wall and foundation. Replace existing exterior siding with new hardi plank siding. Replacement of existing windows and roof. WFPP.
Permit Issued
Issued on 5/11/2025
Issuing Office
Current Status
Permit Finaled on 2/5/2026

Permit Application Status History

Submitted 11/10/2024 APPLICANT
Assigned to Plan Check Engineer 11/15/2024 SUNMIN LEE
Corrections Issued 11/18/2024 SUNMIN LEE
Applicant returned to address corrections 1/8/2025 TSE MING HUANG
Applicant returned to address corrections 1/10/2025 TSE MING HUANG
Applicant returned to address corrections 1/29/2025 TSE MING HUANG
Plan Check Approved 3/12/2025 TSE MING HUANG
Issued 5/11/2025 APPLICANT
Permit Finaled 2/4/2026 ALIZAH MAYAGOITIA

Permit Application Clearance Information

ZI Cleared 1/29/2025 ANDREA MAGANA-WITHERS
Grading Pre-Inspection Cleared 3/12/2025 SUNMIN LEE

Contact Information

Contractor Gonzalez Construction; Lic. No.: 546524-B       ,

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/28/2025 Partial Approval ALIZAH MAYAGOITIA
Grounding or Bonding 7/28/2025 Partial Approval ALIZAH MAYAGOITIA
Footing/Foundation/Slab 8/5/2025 Partial Approval ALIZAH MAYAGOITIA
Footing/Foundation/Slab 8/11/2025 Approved DAVID WILLIAMS
PLUMBING-Rough 8/27/2025 Partial Approval ALIZAH MAYAGOITIA
Wood Frame 8/27/2025 Partial Approval ALIZAH MAYAGOITIA
ELECTRICAL-Rough 9/18/2025 Not Ready for Inspection SALVADOR MARTINEZ
HVAC-Rough 9/18/2025 Corrections Issued SALVADOR MARTINEZ
MERV13>=Rough 9/18/2025 Not Ready for Inspection SALVADOR MARTINEZ
PLUMBING-Rough 9/18/2025 Corrections Issued SALVADOR MARTINEZ
Special/Order Compliance 9/18/2025 Corrections Issued SALVADOR MARTINEZ
Rough-Elec/Plmb/HVAC 10/8/2025 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 10/15/2025 Conditional Approval ALIZAH MAYAGOITIA
Insulation 10/15/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
MERV13>=Rough 10/15/2025 Approved ALIZAH MAYAGOITIA
Wood Frame 10/15/2025 Approved ALIZAH MAYAGOITIA
Drywall Nailing 11/3/2025 Approved GEM DE OCAMPO
Insulation 11/3/2025 Approved GEM DE OCAMPO
Interior/Exterior Lathing 11/3/2025 Approved GEM DE OCAMPO
BUILDING-Rough-Frame 2/4/2026 Approved ALIZAH MAYAGOITIA
Final 2/4/2026 Permit Finaled ALIZAH MAYAGOITIA
MERV13>=Final 2/4/2026 Approved ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 2/4/2026 SGSOV Approved ALIZAH MAYAGOITIA
Smoke Detectors 2/4/2026 Approved ALIZAH MAYAGOITIA