1831 S PONTIUS AVE 90025

Certificate Information: 1831 S PONTIUS AVE 90025

Application / Permit
24016-10000-34630
Plan Check / Job No.
B24LA29523
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(12) Manufacturing
Work Description
REMODEL OF (E) WELD SHOP / MANUFACTURING BLDG. INCLUDES REMOVAL OF INTERIOR MEZZANINE, ROOF AND WALL INFILL. (5,694 SF)
Permit Issued
Issued on 12/5/2024
Issuing Office
Current Status
Issued on 12/5/2024

Permit Application Status History

Submitted 10/29/2024 APPLICANT
Assigned to Plan Check Engineer 10/31/2024 LAWRENCE QUIRANTE
Corrections Issued 11/1/2024 LAWRENCE QUIRANTE
Building Plans Picked Up 11/4/2024 APPLICANT
Plan Check Approved 12/4/2024 SHANGQIN XIE
Issued 12/5/2024 APPLICANT

Permit Application Clearance Information

No Data Available.

Contact Information

Architect Chaney,, Mathew Scott; Lic. No.: C30839 1666 ELECTRIC AVENUE      VENICE, CA 90291
Contractor Pinnacle Contracting Corporation; Lic. No.: 665647-B 21800 BURBANK BLVD #210      WOODLAND HILLS, CA 91367
Engineer Wilkerson,, Ryan Lee; Lic. No.: S4728 20734 SARDINIA WAY      PORTER RANCH, CA 91326

Inspector Information

ROGELIO REYNA, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/25/2025 Partial Inspection CASIMIR BRITTON
Excavation/Setback/Form/Re-Bar 3/26/2025 Approved VASIL MIHALEV
Light Gage Steel Frame 5/15/2025 Approved DANIEL VARNUM
Drywall Nailing 5/20/2025 Approved DANIEL VARNUM
Deputy Drilled-In Anchors 6/20/2025 Conditional Approval RICARDO ROBLES
Deputy Drilled-In Anchors 6/23/2025 Conditional Approval RICARDO ROBLES
Deputy Reinf. Masonry 6/23/2025 Conditional Approval RICARDO ROBLES
Excavation/Setback/Form/Re-Bar 6/24/2025 Partial Approval RICARDO ROBLES
Masonry Wall/Backfill 6/24/2025 Partial Approval RICARDO ROBLES
Deputy Reinf. Masonry 6/25/2025 Conditional Approval RICARDO ROBLES
Deputy Drilled-In Anchors 7/1/2025 Conditional Approval RICARDO ROBLES
Deputy Reinf. Concrete 7/16/2025 Approved RICARDO ROBLES
Final 11/14/2025 Not Ready for Inspection VASIL MIHALEV
METHANE-Final 11/14/2025 Not Ready for Inspection VASIL MIHALEV
METHANE-Rough 11/14/2025 Approved VASIL MIHALEV
Reinforced Masonry Frame 11/14/2025 Not Ready for Inspection VASIL MIHALEV
SGSOV-Seismic Gas S/O Valve 11/14/2025 SGSOV Not Ready VASIL MIHALEV
Smoke Detectors 11/14/2025 Not Ready for Inspection VASIL MIHALEV
Final 11/26/2025 Not Ready for Inspection DANIEL VARNUM
METHANE-Final 11/26/2025 Approved DANIEL VARNUM
METHANE-Rough 11/26/2025 Approved DANIEL VARNUM
Reinforced Masonry Frame 11/26/2025 Not Ready for Inspection DANIEL VARNUM
SGSOV-Seismic Gas S/O Valve 11/26/2025 SGSOV No Gas DANIEL VARNUM
Smoke Detectors 11/26/2025 Approved DANIEL VARNUM
Final 12/12/2025 Not Ready for Inspection RICARDO ROBLES
Reinforced Masonry Frame 12/12/2025 Approved RICARDO ROBLES
Pre-Inspection 12/13/2025 Approved RICARDO ROBLES