119 E 77TH ST 90003
Certificate Information: 119 E 77TH ST 90003
- Application / Permit
- 24016-10000-33606
- Plan Check / Job No.
- X24LA28145
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B. DETACHED GARAGE INCLUDED. "COMPLY WITH DEPARTMENT ORDER effective date 06/18/2014. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
- Permit Issued
- Issued on 10/23/2024
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 12/7/2024
Permit Application Status History
| No Progress | 10/21/2024 | JUDY LY |
| Issued | 10/23/2024 | APPLICANT |
| Permit Finaled | 12/7/2024 | DAVID FEILER |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Team Hero Construction Inc; Lic. No.: 1009760-C39 | 301 E 9TH ST SUITE 415 REDLANDS, CA 92374 |
Inspector Information
| JOHN QUINTANILLA, (213) 792-6055 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 11/9/2024 | Corrections Issued | BEN MOLSTAD |
| Wood Frame | 11/9/2024 | Not Ready for Inspection | BEN MOLSTAD |
| Final | 11/14/2024 | No Access for Inspection | ALEX COLIN |
| SGSOV-Seismic Gas S/O Valve | 11/14/2024 | SGSOV Not Ready | ALEX COLIN |
| Smoke Detectors | 11/14/2024 | No Access for Inspection | ALEX COLIN |
| Final | 12/5/2024 | No Access for Inspection | NICHOLAS LOPEZ |
| SGSOV-Seismic Gas S/O Valve | 12/5/2024 | SGSOV Not Ready | NICHOLAS LOPEZ |
| Smoke Detectors | 12/5/2024 | No Access for Inspection | NICHOLAS LOPEZ |
| Final | 12/7/2024 | Permit Finaled | DAVID FEILER |
| SGSOV-Seismic Gas S/O Valve | 12/7/2024 | SGSOV Approved | DAVID FEILER |
| Smoke Detectors | 12/7/2024 | Approved | DAVID FEILER |