1366 E APPLETON WAY 90291

Certificate Information: 1366 E APPLETON WAY 90291

Application / Permit
24016-10000-32039
Plan Check / Job No.
B24LA26181
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(7) Garage - Private
Work Description
FIRE DAMAGE REPAIR AND RESTORATION OF FRONT PORTION OF GARAGE. NO CHANGE TO SIZE, SHAPE OR ROOF PROFILE.
Permit Issued
Issued on 12/16/2024
Issuing Office
Metro
Current Status
Permit Finaled on 8/28/2025

Permit Application Status History

Submitted 10/7/2024 APPLICANT
Assigned to Plan Check Engineer 10/10/2024 LAWRENCE QUIRANTE
Corrections Issued 10/11/2024 LAWRENCE QUIRANTE
Building Plans Picked Up 10/21/2024 APPLICANT
Plan Check Approved 11/14/2024 JOHN MESIAS
Issued 12/16/2024 APPLICANT
Permit Finaled 8/27/2025 JESUS RODRIGUEZ

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/22/2024 VASIL MIHALEV
Specific Plan Cleared 10/28/2024 RICHARD WOO
Eng Process Fee Ord 176,300 Cleared 11/13/2024 LIAM ODONOVAN
Roof/Waste drainage to street Cleared 11/13/2024 LIAM ODONOVAN

Contact Information

Contractor Paglia & Associates Construction Inc; Lic. No.: 485114-B 2790 EAST REGAL PARK DR      ANAHEIM, CA 92806
Engineer Ionescu,, Benjamin; Lic. No.: C65482 15375 BARRANCA PARKWAY STE B-205      IRVINE, CA 92618

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/10/2025 Not Ready for Inspection JESUS RODRIGUEZ
Deputy Drilled-In Anchors 3/18/2025 Approved JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/18/2025 Approved JESUS RODRIGUEZ
Footing/Foundation/Slab 3/18/2025 Approved JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 4/17/2025 Approved JESUS RODRIGUEZ
Wood Frame 6/2/2025 Not Ready for Inspection BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 6/9/2025 Approved RUBEN RIVAS
Wood Frame 6/9/2025 Not Ready for Inspection RUBEN RIVAS
Interior/Exterior Lathing 6/16/2025 Approved RUBEN RIVAS
Insulation 6/23/2025 Not Ready for Inspection JESUS RODRIGUEZ
Insulation 6/27/2025 Approved JESUS RODRIGUEZ
Final 8/13/2025 Corrections Issued JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 8/13/2025 SGSOV Not Ready JESUS RODRIGUEZ
Special/Order Compliance 8/13/2025 Partial Inspection JAYLIN GRAVITTE
SGSOV-Seismic Gas S/O Valve 8/20/2025 SGSOV Not Ready JESUS RODRIGUEZ
Final 8/22/2025 Not Ready for Inspection MICHAEL ALLEN
Final 8/27/2025 Permit Finaled JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 8/27/2025 SGSOV Approved JESUS RODRIGUEZ