2506 W SCOTT AVE 90026

Certificate Information: 2506 W SCOTT AVE 90026

Application / Permit
24016-10000-29736
Plan Check / Job No.
B24LA23137
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING GARAGE INTO (N) ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(A). (N) UNCOVERED DECK ATTACHED TO ADU. WORK DONE PER ENGINEER DESIGN.
Permit Issued
Issued on 12/4/2024
Issuing Office
Current Status
CofO Issued on 12/18/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/17/2024 APPLICANT
Assigned to Plan Check Engineer 9/20/2024 ALEC MOUSAKHANIAN
Corrections Issued 9/21/2024 ALEC MOUSAKHANIAN
Applicant returned to address corrections 10/9/2024 ALEC MOUSAKHANIAN
Plan Check Approved 10/15/2024 MADISON O'DELL
Issued 12/4/2024 APPLICANT
CofO in Progress 12/17/2025 HAMIK HARTOUNIAN
Permit Finaled 12/18/2025 DEROLD HAUFF
CofO Issued 12/18/2025 DEROLD HAUFF
Permit Finaled 12/18/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 10/5/2024 ABEL CASILLAS
Roof/Waste drainage to street Cleared 10/5/2024 ABEL CASILLAS
Sewer availability Cleared 10/5/2024 ABEL CASILLAS
Grading Pre-Inspection Cleared 10/7/2024 MICHAEL TEMPLE
Eng Process Fee Ord 176,300 Cleared 10/11/2024 ABEL CASILLAS

Contact Information

Contractor Smart Eye Construction Corp; Lic. No.: 1077004-B       ,
Engineer Adzhemyan,, Arsen; Lic. No.: C89103 1010 RALEIGH ST APT 107      GLENDALE, CA 91205

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 12/19/2024 Not Ready for Inspection WILLIAM SIERRA
Underground Mechanical 12/19/2024 Partial Approval WILLIAM SIERRA
Excavation/Setback/Form/Re-Bar 12/31/2024 Corrections Issued HAMIK HARTOUNIAN
Excavation/Setback/Form/Re-Bar 1/10/2025 Corrections Issued HAMIK HARTOUNIAN
Excavation/Setback/Form/Re-Bar 1/15/2025 Approved HAMIK HARTOUNIAN
Floor/Roof Diaphrgm/Shear Wall 2/14/2025 Partial Approval HAMIK HARTOUNIAN
PLUMBING-Rough 2/14/2025 Not Ready for Inspection HAMIK HARTOUNIAN
Floor/Roof Diaphrgm/Shear Wall 2/28/2025 Approved HAMIK HARTOUNIAN
Interior/Exterior Lathing 4/8/2025 Partial Approval HAMIK HARTOUNIAN
PLUMBING-Rough 4/8/2025 Approved HAMIK HARTOUNIAN
ELECTRICAL-Rough 4/29/2025 Corrections Issued FREDDIE RIVERA
HVAC-Rough 4/29/2025 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 5/1/2025 Approved FREDDIE RIVERA
ELECTRICAL-Rough 5/1/2025 Approved FREDDIE RIVERA
Insulation 5/8/2025 Approved ALEX COLIN
Drywall Nailing 5/20/2025 Approved HAMIK HARTOUNIAN
Interior/Exterior Lathing 5/20/2025 Approved HAMIK HARTOUNIAN
Shower Pan 5/20/2025 Approved HAMIK HARTOUNIAN
Underground Mechanical 8/29/2025 Corrections Issued HAMIK HARTOUNIAN
Final 9/25/2025 Not Ready for Inspection OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 9/25/2025 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 9/25/2025 Not Ready for Inspection OSVALDO PARAMO
Final 10/10/2025 Corrections Issued HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 10/10/2025 SGSOV No Gas HAMIK HARTOUNIAN
Smoke Detectors 10/10/2025 Approved HAMIK HARTOUNIAN
Final 12/5/2025 Partial Inspection HAMIK HARTOUNIAN
Final 12/16/2025 OK to Issue CofO HAMIK HARTOUNIAN
Service/Power Release 12/16/2025 Approved HAMIK HARTOUNIAN