2610 W SAXON DR 90065

Certificate Information: 2610 W SAXON DR 90065

Application / Permit
24016-10000-26395
Plan Check / Job No.
B24LA18623
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NON-STRUCTURAL BATHROOMS (2) REMODEL, REMOVE AND REPLACE FIXTURES, CABINETS, LIGHTING, TILE, FLOORING. HVAC, REPLACE (E) DOORS REPLACE (E) WINDOW IN EXISTING 1 STORY RESIDENTIAL BUILDING
Permit Issued
Issued on 8/16/2024
Issuing Office
Metro
Current Status
Permit Finaled on 4/10/2025

Permit Application Status History

Submitted 8/16/2024 APPLICANT
Assigned to Plan Check Engineer 8/16/2024 AUNG SOE
Plan Check Approved 8/16/2024 AUNG SOE
Issued 8/16/2024 APPLICANT
Permit Finaled 4/9/2025 OSVALDO PARAMO

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 9/10/2024 Partial Approval ROY SPAULDING
ELECTRICAL-Rough 9/10/2024 Partial Approval ROY SPAULDING
HVAC-Rough 9/10/2024 Partial Approval ROY SPAULDING
PLUMBING-Rough 9/10/2024 Partial Approval ROY SPAULDING
Drywall Nailing 9/26/2024 Partial Approval ROY SPAULDING
Insulation 9/26/2024 Partial Approval ROY SPAULDING
Interior/Exterior Lathing 9/26/2024 Partial Approval ROY SPAULDING
Shower Pan 9/26/2024 Partial Approval ROY SPAULDING
BUILDING-Rough-Frame 12/4/2024 Not Ready for Inspection THOMAS LOGRASSO
ELECTRICAL-Rough 12/4/2024 Approved THOMAS LOGRASSO
HVAC-Rough 12/4/2024 Approved THOMAS LOGRASSO
PLUMBING-Rough 12/4/2024 Approved THOMAS LOGRASSO
BUILDING-Rough-Frame 12/12/2024 Approved ROY SPAULDING
Drywall Nailing 12/12/2024 Approved ROY SPAULDING
Insulation 12/12/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 12/12/2024 Approved ROY SPAULDING
Shower Pan 12/12/2024 Approved ROY SPAULDING
Final 4/9/2025 Permit Finaled OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 4/9/2025 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 4/9/2025 Approved OSVALDO PARAMO