1501 W MIRAMAR ST 90026
Certificate Information: 1501 W MIRAMAR ST 90026
- Application / Permit
- 24016-10000-23774
- Plan Check / Job No.
- B24LA15050
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Eplan***PROPOSED INTERIOR NON-STRUCTURAL ALTERATION TO APARTMENT BUILDING
- Permit Issued
- Issued on 3/17/2025
- Issuing Office
- Current Status
- Issued on 3/17/2025
Permit Application Status History
| Submitted | 7/30/2024 | APPLICANT |
| Assigned to Plan Check Engineer | 8/1/2024 | SINA KHOSRAVI |
| Assigned to Zoning Architect | 8/1/2024 | SARHAD GHEVANDIAN |
| Corrections Issued | 8/5/2024 | SINA KHOSRAVI |
| Quality Review Completed | 8/14/2024 | CAROLYNN NEPOMUCENO |
| Applicant returned to address corrections | 9/13/2024 | SINA KHOSRAVI |
| Applicant returned to address corrections | 2/28/2025 | SINA KHOSRAVI |
| Plan Check Approved | 3/12/2025 | SINA KHOSRAVI |
| Issued | 3/17/2025 | APPLICANT |
Permit Application Clearance Information
| Historic Resource Verification | Cleared | 9/12/2024 | RAFAEL FONTES |
| Redevelopment Project Area | Cleared | 9/13/2024 | YASMINE BASHIRI |
| Tenant Habitability Plan | Cleared | 10/17/2024 | RICARDO BOHORQUEZ |
| Green Code | Cleared | 10/19/2024 | Samuel Gonzalez |
| DAS Clearance | Cleared | 2/11/2025 | Samuel Gonzalez |
| Public Housing | Cleared | 2/11/2025 | GLEN OLIVER |
| Zoning Plan Check | Cleared | 2/18/2025 | SARHAD GHEVANDIAN |
Contact Information
| Architect | Pence,, Melisa Christine; Lic. No.: NA29539 | , |
| Contractor | Paragon Construction Company Llc; Lic. No.: 1072485-B | , |
Inspector Information
| JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
| REGINA MENDEZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 6/9/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Wood Frame | 6/18/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Wood Frame | 7/2/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/8/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 7/9/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 7/10/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/11/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/14/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/16/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 7/17/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 7/18/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 7/18/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/21/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 7/21/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 7/22/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 7/22/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 7/23/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/24/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 7/24/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/29/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 7/29/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 7/30/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 7/30/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 8/1/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 8/4/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/4/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/5/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/5/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/6/2025 | Partial Approval | TIMOTHY POWELL |
| Insulation | 8/6/2025 | Partial Approval | TIMOTHY POWELL |
| Drywall Nailing | 8/7/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 8/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/8/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 8/8/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 8/9/2025 | Partial Approval | TIMOTHY POWELL |
| Insulation | 8/9/2025 | Partial Approval | TIMOTHY POWELL |
| Drywall Nailing | 8/12/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 8/12/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 8/13/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/14/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/14/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/15/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/15/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/18/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/18/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/19/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/19/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/20/2025 | Partial Approval | RONALD JIMENEZ |
| Insulation | 8/20/2025 | Partial Approval | RONALD JIMENEZ |
| Wood Frame | 8/20/2025 | Partial Approval | RONALD JIMENEZ |
| Drywall Nailing | 8/21/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/21/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/22/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 8/22/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/25/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 8/26/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 8/27/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/27/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/28/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/28/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 8/29/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/29/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/2/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/2/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/2/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/3/2025 | Partial Approval | PAUL BAZERKANIAN |
| Final | 9/3/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Green Building Final | 9/3/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 9/3/2025 | Partial Approval | PAUL BAZERKANIAN |
| SGSOV-Seismic Gas S/O Valve | 9/3/2025 | SGSOV Not Ready | PAUL BAZERKANIAN |
| Smoke Detectors | 9/3/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 9/4/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/4/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/4/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/5/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/5/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/5/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/8/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/8/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Wood Frame | 9/8/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 9/9/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/9/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/9/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/10/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/10/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/10/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 9/11/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 9/11/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Wood Frame | 9/11/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 9/12/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/12/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/12/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 9/15/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/15/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/15/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/16/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/16/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/16/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 9/17/2025 | Partial Approval | JEROME BLACKWOOD |
| Final | 9/17/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Green Building Final | 9/17/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 9/17/2025 | Partial Approval | JEROME BLACKWOOD |
| SGSOV-Seismic Gas S/O Valve | 9/17/2025 | SGSOV Not Ready | JEROME BLACKWOOD |
| Smoke Detectors | 9/17/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Wood Frame | 9/17/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Grading Pre-Inspection | 9/18/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 9/18/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 9/18/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 9/19/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/22/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 9/22/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/23/2025 | Partial Approval | PAUL BAZERKANIAN |
| Final | 9/23/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Green Building Final | 9/23/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/23/2025 | Partial Approval | PAUL BAZERKANIAN |
| SGSOV-Seismic Gas S/O Valve | 9/23/2025 | SGSOV Approved | PAUL BAZERKANIAN |
| Smoke Detectors | 9/23/2025 | Approved | PAUL BAZERKANIAN |
| Drywall Nailing | 9/24/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 9/24/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 9/25/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/25/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/26/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 9/26/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 9/29/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 9/29/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Wood Frame | 9/29/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 9/30/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 9/30/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 10/1/2025 | Partial Approval | LUIS CCAMACHO |
| Insulation | 10/1/2025 | Partial Approval | LUIS CCAMACHO |
| Wood Frame | 10/1/2025 | Partial Approval | LUIS CCAMACHO |
| Insulation | 10/2/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 10/2/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 10/4/2025 | Off-Hour Fees Due | |
| Drywall Nailing | 10/4/2025 | Partial Approval | RONALD JIMENEZ |
| Insulation | 10/4/2025 | Off-Hour Fees Due | |
| Insulation | 10/4/2025 | Partial Approval | RONALD JIMENEZ |
| Drywall Nailing | 10/6/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/6/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Special/Order Compliance | 10/6/2025 | Approved | RONALD JIMENEZ |
| Drywall Nailing | 10/7/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/7/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/8/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/8/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/9/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 10/9/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/10/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 10/10/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 10/14/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 10/14/2025 | No Access for Inspection | JEROME BLACKWOOD |
| Wood Frame | 10/14/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 10/15/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/15/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 10/15/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/16/2025 | No Access for Inspection | JEROME BLACKWOOD |
| Insulation | 10/16/2025 | Partial Approval | JEROME BLACKWOOD |
| Wood Frame | 10/16/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 10/17/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/17/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 10/17/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/18/2025 | Off-Hour Fees Due | |
| Drywall Nailing | 10/18/2025 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Insulation | 10/18/2025 | Off-Hour Fees Due | |
| Insulation | 10/18/2025 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Drywall Nailing | 10/20/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/20/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/21/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/21/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 10/22/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 10/22/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/23/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/23/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/24/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/24/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/27/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/27/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/28/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/28/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/29/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/29/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 10/30/2025 | Partial Approval | ALFREDO LOPEZ |
| Insulation | 10/30/2025 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 10/31/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/31/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/3/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/3/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/4/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/4/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 11/5/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 11/5/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/6/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/6/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/7/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/7/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 11/7/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 11/10/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 11/10/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 11/12/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/12/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 11/12/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 11/13/2025 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Insulation | 11/13/2025 | Partial Approval | CHRISTOPHER BLACKWOOD |
| Wood Frame | 11/13/2025 | Not Ready for Inspection | CHRISTOPHER BLACKWOOD |
| Drywall Nailing | 11/14/2025 | Partial Approval | TIMOTHY POWELL |
| Insulation | 11/14/2025 | Partial Approval | TIMOTHY POWELL |
| Drywall Nailing | 11/17/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 11/17/2025 | Partial Approval | JEROME BLACKWOOD |
| Wood Frame | 11/17/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 11/18/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/18/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/19/2025 | Partial Approval | PAUL BAZERKANIAN |
| Floor/Roof Diaphrgm/Shear Wall | 11/19/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 11/20/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 11/20/2025 | Partial Approval | JEROME BLACKWOOD |
| Wood Frame | 11/20/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 11/21/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/21/2025 | Partial Approval | PAUL BAZERKANIAN |
| Reinforced Concrete Frame | 11/21/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/24/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 11/24/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 11/24/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 11/25/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 11/25/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 12/1/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 12/1/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Wood Frame | 12/1/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 12/2/2025 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 12/2/2025 | Partial Approval | PAUL BAZERKANIAN |
| Wood Frame | 12/2/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 12/3/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 12/3/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 12/4/2025 | Partial Approval | PAUL BAZERKANIAN |
| Final | 12/4/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Green Building Final | 12/4/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 12/4/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 12/9/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 12/10/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 12/11/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Special/Order Compliance | 12/11/2025 | Partial Approval | SCOTT SOBEL |
| Drywall Nailing | 12/18/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 12/18/2025 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Wood Frame | 1/7/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 1/9/2026 | Partial Approval | EDWIN GREGORYONA |
| Drywall Nailing | 1/12/2026 | Partial Approval | PAUL BAZERKANIAN |
| Special/Order Compliance | 1/12/2026 | Partial Inspection | REGINA MENDEZ |
| Insulation | 1/15/2026 | Partial Approval | PAUL BAZERKANIAN |
| Special/Order Compliance | 1/15/2026 | Partial Inspection | REGINA MENDEZ |
| Drywall Nailing | 1/20/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 1/20/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 1/21/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Insulation | 1/21/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 1/23/2026 | Partial Approval | IAN BLINN |
| Insulation | 1/23/2026 | Partial Approval | IAN BLINN |
| Drywall Nailing | 1/26/2026 | Partial Approval | LARRY ARNICK |
| Insulation | 1/26/2026 | Partial Approval | LARRY ARNICK |
| Drywall Nailing | 1/27/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 1/27/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/3/2026 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Insulation | 2/3/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 2/4/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 2/4/2026 | Not Ready for Inspection | PAUL BAZERKANIAN |
| Drywall Nailing | 2/5/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 2/5/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 2/6/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/6/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/9/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/9/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/10/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Insulation | 2/10/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/11/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/11/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/12/2026 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 2/12/2026 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 2/13/2026 | Partial Approval | IAN BLINN |
| Insulation | 2/13/2026 | No Access for Inspection | IAN BLINN |
| Drywall Nailing | 2/17/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Insulation | 2/17/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/18/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/18/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Drywall Nailing | 2/19/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Insulation | 2/19/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/20/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/20/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/23/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/23/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/24/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/24/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/25/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/25/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/26/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/26/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/27/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 2/27/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/2/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/2/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Drywall Nailing | 3/3/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/3/2026 | Partial Approval | REGINA MENDEZ |
| Wood Frame | 3/3/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/4/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/4/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Drywall Nailing | 3/5/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 3/5/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 3/6/2026 | Not Ready for Inspection | SEAN POMISH |
| Insulation | 3/6/2026 | Not Ready for Inspection | SEAN POMISH |
| Drywall Nailing | 3/9/2026 | Not Ready for Inspection | ALFREDO LOPEZ |
| Insulation | 3/9/2026 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 3/10/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 3/10/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 3/11/2026 | Partial Approval | ALFREDO LOPEZ |
| Insulation | 3/11/2026 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 3/12/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 3/12/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 3/13/2026 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 3/13/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 3/16/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/16/2026 | Partial Approval | REGINA MENDEZ |
| Light Gage Steel Frame | 3/16/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/17/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/17/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/18/2026 | Partial Inspection | REGINA MENDEZ |
| Insulation | 3/18/2026 | Partial Inspection | REGINA MENDEZ |
| Drywall Nailing | 3/20/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/20/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/23/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Floor/Roof Diaphrgm/Shear Wall | 3/23/2026 | Not Ready for Inspection | REGINA MENDEZ |
| Insulation | 3/23/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/24/2026 | Partial Approval | REGINA MENDEZ |
| Reinforced Concrete Frame | 3/24/2026 | Partial Approval | REGINA MENDEZ |
| Wood Frame | 3/24/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 3/31/2026 | Partial Approval | REGINA MENDEZ |
| Insulation | 3/31/2026 | Partial Approval | REGINA MENDEZ |