1501 W MIRAMAR ST 90026

Certificate Information: 1501 W MIRAMAR ST 90026

Application / Permit
24016-10000-23774
Plan Check / Job No.
B24LA15050
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Eplan***PROPOSED INTERIOR NON-STRUCTURAL ALTERATION TO APARTMENT BUILDING
Permit Issued
Issued on 3/17/2025
Issuing Office
Current Status
Issued on 3/17/2025

Permit Application Status History

Submitted 7/30/2024 APPLICANT
Assigned to Plan Check Engineer 8/1/2024 SINA KHOSRAVI
Assigned to Zoning Architect 8/1/2024 SARHAD GHEVANDIAN
Corrections Issued 8/5/2024 SINA KHOSRAVI
Quality Review Completed 8/14/2024 CAROLYNN NEPOMUCENO
Applicant returned to address corrections 9/13/2024 SINA KHOSRAVI
Applicant returned to address corrections 2/28/2025 SINA KHOSRAVI
Plan Check Approved 3/12/2025 SINA KHOSRAVI
Issued 3/17/2025 APPLICANT

Permit Application Clearance Information

Historic Resource Verification Cleared 9/12/2024 RAFAEL FONTES
Redevelopment Project Area Cleared 9/13/2024 YASMINE BASHIRI
Tenant Habitability Plan Cleared 10/17/2024 RICARDO BOHORQUEZ
Green Code Cleared 10/19/2024 Samuel Gonzalez
DAS Clearance Cleared 2/11/2025 Samuel Gonzalez
Public Housing Cleared 2/11/2025 GLEN OLIVER
Zoning Plan Check Cleared 2/18/2025 SARHAD GHEVANDIAN

Contact Information

Architect Pence,, Melisa Christine; Lic. No.: NA29539       ,
Contractor Paragon Construction Company Llc; Lic. No.: 1072485-B       ,

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/9/2025 Not Ready for Inspection PAUL BAZERKANIAN
Wood Frame 6/18/2025 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 7/2/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/7/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/8/2025 Partial Approval PAUL BAZERKANIAN
Insulation 7/9/2025 Partial Approval JEROME BLACKWOOD
Insulation 7/10/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/11/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/14/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/16/2025 Partial Approval PAUL BAZERKANIAN
Insulation 7/17/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 7/18/2025 Partial Approval JEROME BLACKWOOD
Insulation 7/18/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/21/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 7/21/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 7/22/2025 Partial Approval JEROME BLACKWOOD
Insulation 7/22/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 7/23/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/24/2025 Partial Approval JEROME BLACKWOOD
Insulation 7/24/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/29/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 7/29/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 7/30/2025 Partial Approval JEROME BLACKWOOD
Insulation 7/30/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 8/1/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/4/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/4/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/5/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/5/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/6/2025 Partial Approval TIMOTHY POWELL
Insulation 8/6/2025 Partial Approval TIMOTHY POWELL
Drywall Nailing 8/7/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 8/7/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/8/2025 Partial Approval PAUL BAZERKANIAN
Insulation 8/8/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/9/2025 Partial Approval TIMOTHY POWELL
Insulation 8/9/2025 Partial Approval TIMOTHY POWELL
Drywall Nailing 8/12/2025 Partial Approval PAUL BAZERKANIAN
Insulation 8/12/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/13/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/14/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/14/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/15/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/15/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/18/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/18/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/19/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/19/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/20/2025 Partial Approval RONALD JIMENEZ
Insulation 8/20/2025 Partial Approval RONALD JIMENEZ
Wood Frame 8/20/2025 Partial Approval RONALD JIMENEZ
Drywall Nailing 8/21/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/21/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/22/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 8/22/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/25/2025 Partial Approval PAUL BAZERKANIAN
Insulation 8/26/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/27/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/27/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/28/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/28/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 8/29/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/29/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 9/2/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/2/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/2/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/3/2025 Partial Approval PAUL BAZERKANIAN
Final 9/3/2025 Not Ready for Inspection PAUL BAZERKANIAN
Green Building Final 9/3/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 9/3/2025 Partial Approval PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 9/3/2025 SGSOV Not Ready PAUL BAZERKANIAN
Smoke Detectors 9/3/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 9/4/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/4/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/4/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/5/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/5/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/5/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/8/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/8/2025 Not Ready for Inspection PAUL BAZERKANIAN
Wood Frame 9/8/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 9/9/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/9/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/9/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/10/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/10/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/10/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 9/11/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 9/11/2025 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 9/11/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 9/12/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/12/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/12/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 9/15/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/15/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/15/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/16/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/16/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/16/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 9/17/2025 Partial Approval JEROME BLACKWOOD
Final 9/17/2025 Not Ready for Inspection JEROME BLACKWOOD
Green Building Final 9/17/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 9/17/2025 Partial Approval JEROME BLACKWOOD
SGSOV-Seismic Gas S/O Valve 9/17/2025 SGSOV Not Ready JEROME BLACKWOOD
Smoke Detectors 9/17/2025 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 9/17/2025 Not Ready for Inspection JEROME BLACKWOOD
Grading Pre-Inspection 9/18/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 9/18/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 9/18/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 9/19/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/22/2025 Partial Approval JEROME BLACKWOOD
Insulation 9/22/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 9/23/2025 Partial Approval PAUL BAZERKANIAN
Final 9/23/2025 Not Ready for Inspection PAUL BAZERKANIAN
Green Building Final 9/23/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/23/2025 Partial Approval PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 9/23/2025 SGSOV Approved PAUL BAZERKANIAN
Smoke Detectors 9/23/2025 Approved PAUL BAZERKANIAN
Drywall Nailing 9/24/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 9/24/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 9/25/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/25/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/26/2025 Partial Approval PAUL BAZERKANIAN
Insulation 9/26/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 9/29/2025 Partial Approval JEROME BLACKWOOD
Insulation 9/29/2025 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 9/29/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 9/30/2025 Partial Approval JEROME BLACKWOOD
Insulation 9/30/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 10/1/2025 Partial Approval LUIS CCAMACHO
Insulation 10/1/2025 Partial Approval LUIS CCAMACHO
Wood Frame 10/1/2025 Partial Approval LUIS CCAMACHO
Insulation 10/2/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 10/2/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 10/4/2025 Off-Hour Fees Due
Drywall Nailing 10/4/2025 Partial Approval RONALD JIMENEZ
Insulation 10/4/2025 Off-Hour Fees Due
Insulation 10/4/2025 Partial Approval RONALD JIMENEZ
Drywall Nailing 10/6/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/6/2025 Not Ready for Inspection PAUL BAZERKANIAN
Special/Order Compliance 10/6/2025 Approved RONALD JIMENEZ
Drywall Nailing 10/7/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/7/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/8/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/8/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/9/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 10/9/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/10/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 10/10/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 10/14/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 10/14/2025 No Access for Inspection JEROME BLACKWOOD
Wood Frame 10/14/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 10/15/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/15/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 10/15/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/16/2025 No Access for Inspection JEROME BLACKWOOD
Insulation 10/16/2025 Partial Approval JEROME BLACKWOOD
Wood Frame 10/16/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 10/17/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/17/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 10/17/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/18/2025 Off-Hour Fees Due
Drywall Nailing 10/18/2025 Partial Approval CHRISTOPHER BLACKWOOD
Insulation 10/18/2025 Off-Hour Fees Due
Insulation 10/18/2025 Partial Approval CHRISTOPHER BLACKWOOD
Drywall Nailing 10/20/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/20/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/21/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/21/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 10/22/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 10/22/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/23/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/23/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/24/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/24/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/27/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/27/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/28/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/28/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/29/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/29/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 10/30/2025 Partial Approval ALFREDO LOPEZ
Insulation 10/30/2025 Partial Approval ALFREDO LOPEZ
Drywall Nailing 10/31/2025 Partial Approval PAUL BAZERKANIAN
Insulation 10/31/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 11/3/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/3/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 11/4/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/4/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 11/5/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 11/5/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 11/6/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/6/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 11/7/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/7/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 11/7/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 11/10/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 11/10/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 11/12/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/12/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 11/12/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 11/13/2025 Partial Approval CHRISTOPHER BLACKWOOD
Insulation 11/13/2025 Partial Approval CHRISTOPHER BLACKWOOD
Wood Frame 11/13/2025 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Drywall Nailing 11/14/2025 Partial Approval TIMOTHY POWELL
Insulation 11/14/2025 Partial Approval TIMOTHY POWELL
Drywall Nailing 11/17/2025 Partial Approval JEROME BLACKWOOD
Insulation 11/17/2025 Partial Approval JEROME BLACKWOOD
Wood Frame 11/17/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 11/18/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/18/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 11/19/2025 Partial Approval PAUL BAZERKANIAN
Floor/Roof Diaphrgm/Shear Wall 11/19/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 11/20/2025 Partial Approval JEROME BLACKWOOD
Insulation 11/20/2025 Partial Approval JEROME BLACKWOOD
Wood Frame 11/20/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 11/21/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/21/2025 Partial Approval PAUL BAZERKANIAN
Reinforced Concrete Frame 11/21/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 11/24/2025 Partial Approval PAUL BAZERKANIAN
Insulation 11/24/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 11/24/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 11/25/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 11/25/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 12/1/2025 Partial Approval JEROME BLACKWOOD
Insulation 12/1/2025 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 12/1/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 12/2/2025 Partial Approval PAUL BAZERKANIAN
Insulation 12/2/2025 Partial Approval PAUL BAZERKANIAN
Wood Frame 12/2/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 12/3/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 12/3/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 12/4/2025 Partial Approval PAUL BAZERKANIAN
Final 12/4/2025 Not Ready for Inspection PAUL BAZERKANIAN
Green Building Final 12/4/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 12/4/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 12/9/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 12/10/2025 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 12/11/2025 Not Ready for Inspection PAUL BAZERKANIAN
Special/Order Compliance 12/11/2025 Partial Approval SCOTT SOBEL
Drywall Nailing 12/18/2025 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 12/18/2025 Not Ready for Inspection PAUL BAZERKANIAN
Wood Frame 1/7/2026 Partial Approval PAUL BAZERKANIAN
Insulation 1/9/2026 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/12/2026 Partial Approval PAUL BAZERKANIAN
Special/Order Compliance 1/12/2026 Partial Inspection REGINA MENDEZ
Insulation 1/15/2026 Partial Approval PAUL BAZERKANIAN
Special/Order Compliance 1/15/2026 Partial Inspection REGINA MENDEZ
Drywall Nailing 1/20/2026 Partial Approval REGINA MENDEZ
Insulation 1/20/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 1/21/2026 Not Ready for Inspection REGINA MENDEZ
Insulation 1/21/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 1/23/2026 Partial Approval IAN BLINN
Insulation 1/23/2026 Partial Approval IAN BLINN
Drywall Nailing 1/26/2026 Partial Approval LARRY ARNICK
Insulation 1/26/2026 Partial Approval LARRY ARNICK
Drywall Nailing 1/27/2026 Partial Approval REGINA MENDEZ
Insulation 1/27/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/3/2026 Not Ready for Inspection PAUL BAZERKANIAN
Insulation 2/3/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 2/4/2026 Partial Approval PAUL BAZERKANIAN
Insulation 2/4/2026 Not Ready for Inspection PAUL BAZERKANIAN
Drywall Nailing 2/5/2026 Partial Approval PAUL BAZERKANIAN
Insulation 2/5/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 2/6/2026 Partial Approval REGINA MENDEZ
Insulation 2/6/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/9/2026 Partial Approval REGINA MENDEZ
Insulation 2/9/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/10/2026 Not Ready for Inspection REGINA MENDEZ
Insulation 2/10/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/11/2026 Partial Approval REGINA MENDEZ
Insulation 2/11/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/12/2026 Not Ready for Inspection JEROME BLACKWOOD
Insulation 2/12/2026 Partial Approval JEROME BLACKWOOD
Drywall Nailing 2/13/2026 Partial Approval IAN BLINN
Insulation 2/13/2026 No Access for Inspection IAN BLINN
Drywall Nailing 2/17/2026 Not Ready for Inspection REGINA MENDEZ
Insulation 2/17/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/18/2026 Partial Approval REGINA MENDEZ
Insulation 2/18/2026 Not Ready for Inspection REGINA MENDEZ
Drywall Nailing 2/19/2026 Not Ready for Inspection REGINA MENDEZ
Insulation 2/19/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/20/2026 Partial Approval REGINA MENDEZ
Insulation 2/20/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/23/2026 Partial Approval REGINA MENDEZ
Insulation 2/23/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/24/2026 Partial Approval REGINA MENDEZ
Insulation 2/24/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/25/2026 Partial Approval REGINA MENDEZ
Insulation 2/25/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/26/2026 Partial Approval REGINA MENDEZ
Insulation 2/26/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 2/27/2026 Partial Approval REGINA MENDEZ
Insulation 2/27/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/2/2026 Partial Approval REGINA MENDEZ
Insulation 3/2/2026 Not Ready for Inspection REGINA MENDEZ
Drywall Nailing 3/3/2026 Partial Approval REGINA MENDEZ
Insulation 3/3/2026 Partial Approval REGINA MENDEZ
Wood Frame 3/3/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/4/2026 Partial Approval REGINA MENDEZ
Insulation 3/4/2026 Not Ready for Inspection REGINA MENDEZ
Drywall Nailing 3/5/2026 Partial Approval PAUL BAZERKANIAN
Insulation 3/5/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 3/6/2026 Not Ready for Inspection SEAN POMISH
Insulation 3/6/2026 Not Ready for Inspection SEAN POMISH
Drywall Nailing 3/9/2026 Not Ready for Inspection ALFREDO LOPEZ
Insulation 3/9/2026 Partial Approval ALFREDO LOPEZ
Drywall Nailing 3/10/2026 Partial Approval PAUL BAZERKANIAN
Insulation 3/10/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 3/11/2026 Partial Approval ALFREDO LOPEZ
Insulation 3/11/2026 Partial Approval ALFREDO LOPEZ
Drywall Nailing 3/12/2026 Partial Approval PAUL BAZERKANIAN
Insulation 3/12/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 3/13/2026 Partial Approval PAUL BAZERKANIAN
Insulation 3/13/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 3/16/2026 Partial Approval REGINA MENDEZ
Insulation 3/16/2026 Partial Approval REGINA MENDEZ
Light Gage Steel Frame 3/16/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/17/2026 Partial Approval REGINA MENDEZ
Insulation 3/17/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/18/2026 Partial Inspection REGINA MENDEZ
Insulation 3/18/2026 Partial Inspection REGINA MENDEZ
Drywall Nailing 3/20/2026 Partial Approval REGINA MENDEZ
Insulation 3/20/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/23/2026 Not Ready for Inspection REGINA MENDEZ
Floor/Roof Diaphrgm/Shear Wall 3/23/2026 Not Ready for Inspection REGINA MENDEZ
Insulation 3/23/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/24/2026 Partial Approval REGINA MENDEZ
Reinforced Concrete Frame 3/24/2026 Partial Approval REGINA MENDEZ
Wood Frame 3/24/2026 Partial Approval REGINA MENDEZ
Drywall Nailing 3/31/2026 Partial Approval REGINA MENDEZ
Insulation 3/31/2026 Partial Approval REGINA MENDEZ