5350 E BORLAND ROAD 90032
Certificate Information: 5350 E BORLAND ROAD 90032
- Application / Permit
- 24016-10000-23748
- Plan Check / Job No.
- X24LA15030
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 1 Kitchen 1 Bathroom remodel for residential buildings ( no structural changes ) COMBINED WITH MECH/ELEC/PLUMB. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. 10 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 7/25/2024
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 12/4/2024
Permit Application Status History
| Issued | 7/25/2024 | APPLICANT |
| Permit Finaled | 12/4/2024 | BRENDAN MORELLI |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Orendain Building Contracting Corp; Lic. No.: 1036707-B | 650 S 4TH AVE LA PUENTE, CA 91746 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 11/1/2024 | Approved | LILIANA PORTILLO |
| Rough-Elec/Plmb/HVAC | 11/1/2024 | Approved | LILIANA PORTILLO |
| Drywall Nailing | 11/6/2024 | Approved | LILIANA PORTILLO |
| Gas Test | 11/6/2024 | Approved | LILIANA PORTILLO |
| Insulation | 11/6/2024 | Approved | LILIANA PORTILLO |
| Interior/Exterior Lathing | 11/6/2024 | Approved | LILIANA PORTILLO |
| ELECTRICAL-Final | 11/27/2024 | Approved | LILIANA PORTILLO |
| Final | 11/27/2024 | Corrections Issued | LILIANA PORTILLO |
| HVAC-Final | 11/27/2024 | Approved | LILIANA PORTILLO |
| PLUMBING-Final | 11/27/2024 | Approved | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 11/27/2024 | SGSOV Not Ready | LILIANA PORTILLO |
| Smoke Detectors | 11/27/2024 | Approved | LILIANA PORTILLO |
| Final | 12/4/2024 | Permit Finaled | BRENDAN MORELLI |
| SGSOV-Seismic Gas S/O Valve | 12/4/2024 | SGSOV Approved | BRENDAN MORELLI |