5350 E BORLAND ROAD 90032

Certificate Information: 5350 E BORLAND ROAD 90032

Application / Permit
24016-10000-23748
Plan Check / Job No.
X24LA15030
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1 Kitchen 1 Bathroom remodel for residential buildings ( no structural changes ) COMBINED WITH MECH/ELEC/PLUMB. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. 10 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
Permit Issued
Issued on 7/25/2024
Issuing Office
Metro
Current Status
Permit Finaled on 12/4/2024

Permit Application Status History

Issued 7/25/2024 APPLICANT
Permit Finaled 12/4/2024 BRENDAN MORELLI

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Orendain Building Contracting Corp; Lic. No.: 1036707-B 650 S 4TH AVE      LA PUENTE, CA 91746

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 11/1/2024 Approved LILIANA PORTILLO
Rough-Elec/Plmb/HVAC 11/1/2024 Approved LILIANA PORTILLO
Drywall Nailing 11/6/2024 Approved LILIANA PORTILLO
Gas Test 11/6/2024 Approved LILIANA PORTILLO
Insulation 11/6/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 11/6/2024 Approved LILIANA PORTILLO
ELECTRICAL-Final 11/27/2024 Approved LILIANA PORTILLO
Final 11/27/2024 Corrections Issued LILIANA PORTILLO
HVAC-Final 11/27/2024 Approved LILIANA PORTILLO
PLUMBING-Final 11/27/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 11/27/2024 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 11/27/2024 Approved LILIANA PORTILLO
Final 12/4/2024 Permit Finaled BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 12/4/2024 SGSOV Approved BRENDAN MORELLI