[ePlan] INTERIOR AND EXTERIOR REMODEL TO EXISTING SFD W/ATTACHED GARAGE. PROPOSED EXTERIOR STAIRS.
Permit Issued
Issued on 3/3/2025
Issuing Office
Current Status
Permit Finaled on 1/16/2026

Permit Application Status History

Submitted 7/15/2024 APPLICANT
Assigned to Plan Check Engineer 8/1/2024 CRYSTEL MAALOUF
Corrections Issued 8/10/2024 CRYSTEL MAALOUF
Quality Review Completed 8/16/2024 SINA KHOSRAVI
Applicant returned to address corrections 10/2/2024 CRYSTEL MAALOUF
Applicant returned to address corrections 10/21/2024 CRYSTEL MAALOUF
Plan Check Approved 10/29/2024 CRYSTEL MAALOUF
Issued 3/3/2025 APPLICANT
Permit Finaled 1/15/2026 CHRISTOPHER WILSON

Permit Application Clearance Information

GPI Written Notices Cleared 10/29/2024 CRYSTEL MAALOUF
Grading Pre-Inspection Cleared 10/29/2024 MATTHEW JENKINS

Contact Information

Architect Moss,, Kyle A; Lic. No.: C28077 2627 30TH STREET      SANTA MONICA, CA 90405
Architect Moss,, Kyle A; Lic. No.: NA28077       ,
Contractor H A S Construction Inc; Lic. No.: 538538-B       ,
Engineer Tosounian,, Oshin Bedros; Lic. No.: NA3730       ,
Engineer Tosounian,, Oshin Bedros; Lic. No.: S3730 18333 ALGIERS ST      PORTER RANCH, CA 91326

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/26/2025 Conditional Approval DANIEL VERA
Deputy Reinf. Concrete 5/9/2025 Conditional Approval DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 6/25/2025 Approved DANIEL VERA
HVAC-Rough 6/26/2025 Not Ready for Inspection DANIEL VERA
PLUMBING-Rough 6/26/2025 Corrections Issued DANIEL VERA
ELECTRICAL-Rough 6/27/2025 Partial Approval DANIEL VERA
ELECTRICAL-Rough 7/24/2025 Approved DANIEL VERA
HVAC-Rough 7/24/2025 Approved DANIEL VERA
PLUMBING-Rough 7/24/2025 Approved DANIEL VERA
Deputy Wood Construction 7/28/2025 Conditional Approval DANIEL VERA
BUILDING-Rough-Frame 7/29/2025 Not Ready for Inspection DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 7/29/2025 Approved DANIEL VERA
METHANE-Rough 7/29/2025 Partial Approval DANIEL VERA
BUILDING-Rough-Frame 7/31/2025 Approved DANIEL VERA
Green Building Rough 7/31/2025 Approved DANIEL VERA
METHANE-Rough 7/31/2025 Approved DANIEL VERA
Insulation 8/6/2025 Approved DANIEL VERA
Pre-Inspection 8/6/2025 Approved DANIEL VERA
Shower Pan 8/6/2025 Approved DANIEL VERA
Drywall Nailing 8/19/2025 Approved DANIEL VERA
Interior/Exterior Lathing 8/22/2025 Partial Approval DANIEL VERA
Interior/Exterior Lathing 9/29/2025 Approved DANIEL VERA
Gas Test 11/14/2025 Approved DANIEL VERA
ELECTRICAL-Final 12/11/2025 Approved EVAN COOPER
HVAC-Final 12/11/2025 Approved EVAN COOPER
PLUMBING-Final 12/11/2025 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 12/11/2025 SGSOV Approved EVAN COOPER
Smoke Detectors 12/11/2025 Approved EVAN COOPER
Final 1/15/2026 Permit Finaled CHRISTOPHER WILSON