4026 N ELDERBANK DR 90031

Certificate Information: 4026 N ELDERBANK DR 90031

Application / Permit
24016-10000-19307
Plan Check / Job No.
B24LA11238
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
STRUCTURAL RETROFIT OF (E) SFH HOUSE FOUNDATIONS ON HILLSIDE NO ADDED SF, ONLY STRUCTURAL WORK WITH SOIL REPORT
Permit Issued
Issued on 12/3/2024
Issuing Office
Metro
Current Status
Permit Finaled on 12/19/2025

Permit Application Status History

Submitted 6/12/2024 APPLICANT
Assigned to Plan Check Engineer 6/13/2024 KHEDER ALRAZAA
Corrections Issued 6/28/2024 KHEDER ALRAZAA
Quality Review Completed 6/28/2024 KEN GILL
Building Plans Picked Up 7/10/2024 APPLICANT
Applicant returned to address corrections 9/20/2024 KHEDER ALRAZAA
Plan Check Approved 11/15/2024 KHEDER ALRAZAA
Issued 12/3/2024 APPLICANT
Permit Finaled 12/19/2025 ALIZAH MAYAGOITIA

Permit Application Clearance Information

ZI Cleared 7/24/2024 SPENCER WEJROWSKI
Grading Pre-Inspection Cleared 9/20/2024 LANNY MERRICK

Contact Information

Contractor Sulgatti General Contractors Inc; Lic. No.: 912572-B 2341 FLINTRIDGE DRIVE      GLENDALE, CA 91206
Engineer Mahlow,, Elizabeth Joy Johnson; Lic. No.: C80463 600 WILSHIRE BLVD   SUITE 760    LOS ANGELES, CA 90065
Engineer Tsai,, Steve Shi-Shen; Lic. No.: GE2268 1545 VICTORY BLVD      GLENDALE, CA 91201
Geologist Carnegie,, Vincent John; Lic. No.: EG1608 P.O. BOX 5444      GLENDALE, CA 912012036

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 12/20/2024 Approved LILIANA PORTILLO
Deputy Reinf. Concrete 1/15/2025 Approved LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 1/15/2025 Partial Approval LILIANA PORTILLO
Footing/Foundation/Slab 1/15/2025 Not Ready for Inspection LILIANA PORTILLO
Deputy Reinf. Concrete 1/16/2025 Conditional Approval NICHOLAS LOPEZ
Deputy Reinf. Concrete 1/31/2025 Conditional Approval BRENDAN MORELLI
Reinforced Concrete Frame 2/3/2025 Partial Approval LILIANA PORTILLO
Footing/Foundation/Slab 5/16/2025 Approved LILIANA PORTILLO
Reinforced Masonry Frame 7/15/2025 Partial Approval LILIANA PORTILLO
Deputy Reinf. Masonry 7/23/2025 Approved LILIANA PORTILLO
Reinforced Masonry Frame 7/23/2025 Approved LILIANA PORTILLO
Deputy Reinf. Masonry 8/1/2025 Conditional Approval LILIANA PORTILLO
Final 9/12/2025 Corrections Issued LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 9/12/2025 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 9/12/2025 Corrections Issued LILIANA PORTILLO
Wood Frame 9/12/2025 Approved LILIANA PORTILLO
Final 12/19/2025 Permit Finaled ALIZAH MAYAGOITIA
Smoke Detectors 12/19/2025 Approved ALIZAH MAYAGOITIA