9714 W HOLCOMB ST 90035

Certificate Information: 9714 W HOLCOMB ST 90035

Application / Permit
24016-10000-16934
Plan Check / Job No.
B24LA09768
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REPLACE EXISTING ROOFING MATERIAL WITH SPANISH CLAY TILES PROPOSED NEW SHEAR WALL AT 2ND FLOOR REPLACE EXISTING WINDOWS AND EXTERIOR DOORS (SAME SIZE) REPLACE EXISTING KITCHEN AND BATHROOM FINISHES, PLUMBING AND ELECTRICAL FIXTURES, AND CABINETS - FIXTURE LOCATIONS TO REMAIN THE SAME. REPLACE EXISTING FLOOR FINISHES THROUGHOUT.
Permit Issued
Issued on 5/22/2024
Issuing Office
Current Status
Permit Finaled on 11/21/2025

Permit Application Status History

Plan Check Approved 5/22/2024 JOSEPH RAFOLS
Issued 5/22/2024 APPLICANT
Permit Finaled 11/20/2025 ASHLEY THOMPSON

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Gramercy Group Design And Build Inc The; Lic. No.: 943331-B 149 S BARRINGTON AVENUE   SUITE 671    BRENTWOOD, CA 90049
Engineer Basma,, Ali J; Lic. No.: C53080 6047 TAMPA AVE   SUITE 304    TARZANA, CA 91356

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Wood Construction 8/15/2024 Conditional Approval ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 8/22/2024 Corrections Issued ASHLEY THOMPSON
Special/Order Compliance 8/22/2024 Partial Inspection REGINA MENDEZ
BUILDING-Rough-Frame 9/12/2024 Corrections Issued ASHLEY THOMPSON
Shower Pan 10/29/2024 Corrections Issued ASHLEY THOMPSON
Shower Pan 11/6/2024 Approved ASHLEY THOMPSON
ELECTRICAL-Rough 11/25/2024 Partial Approval SEAN HAUPT
PLUMBING-Rough 11/25/2024 Corrections Issued SEAN HAUPT
BUILDING-Rough-Frame 12/6/2024 Partial Approval MEL KHACHATOURIAN
ELECTRICAL-Rough 12/6/2024 Approved MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 12/6/2024 Approved MEL KHACHATOURIAN
PLUMBING-Rough 12/6/2024 Approved MEL KHACHATOURIAN
BUILDING-Rough-Frame 12/12/2024 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 12/12/2024 Partial Approval ARAM AVEDISIAN
Drywall Nailing 1/10/2025 Approved BOBBY KEY
Interior/Exterior Lathing 1/10/2025 Approved BOBBY KEY
Special/Order Compliance 1/10/2025 Partial Inspection JAYLIN GRAVITTE
ELECTRICAL-Final 11/12/2025 Approved ASHLEY THOMPSON
HVAC-Final 11/12/2025 Approved ASHLEY THOMPSON
PLUMBING-Final 11/12/2025 Corrections Issued ASHLEY THOMPSON
ELECTRICAL-Final 11/17/2025 Approved ASHLEY THOMPSON
Final 11/17/2025 Corrections Issued ASHLEY THOMPSON
HVAC-Final 11/17/2025 Approved ASHLEY THOMPSON
PLUMBING-Final 11/17/2025 Approved ASHLEY THOMPSON
SGSOV-Seismic Gas S/O Valve 11/17/2025 SGSOV Not Ready ASHLEY THOMPSON
Smoke Detectors 11/17/2025 Approved ASHLEY THOMPSON
ELECTRICAL-Final 11/20/2025 Approved ASHLEY THOMPSON
Final 11/20/2025 Permit Finaled ASHLEY THOMPSON
HVAC-Final 11/20/2025 Approved ASHLEY THOMPSON
PLUMBING-Final 11/20/2025 Approved ASHLEY THOMPSON
SGSOV-Seismic Gas S/O Valve 11/20/2025 SGSOV Approved ASHLEY THOMPSON