6718 S 7TH AVE 90043
Certificate Information: 6718 S 7TH AVE 90043
- Application / Permit
- 24016-10000-13763
- Plan Check / Job No.
- X24LA04489
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 11 Window and 2 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24. Including Mechanical. Electrical, Plumbing and HVAC 1 Kitchen 2 Bathroom remodel for residential buildings (no structural changes). Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 (b) 2B
- Permit Issued
- Issued on 4/25/2024
- Issuing Office
- Metro
- Current Status
- Permit Closed on 6/20/2024
Permit Application Status History
| Issued | 4/25/2024 | APPLICANT |
| Permit Closed | 6/18/2024 | JOSE MACIAS |
| Permit Closed | 6/18/2024 | JOSE MACIAS |
| Permit Closed | 6/18/2024 | JOSE MACIAS |
| Permit Closed | 6/18/2024 | JOSE MACIAS |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| SALVADOR MARTINEZ, (213) 202-3479 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 5/11/2024 | Approved | JESUS RODRIGUEZ |
| ELECTRICAL-Rough | 5/18/2024 | Corrections Issued | HERBERT GIRON |
| HVAC-Rough | 5/18/2024 | Corrections Issued | HERBERT GIRON |
| PLUMBING-Rough | 5/18/2024 | Corrections Issued | HERBERT GIRON |
| Special/Order Compliance | 5/18/2024 | Corrections Issued | HERBERT GIRON |
| BUILDING-Rough-Frame | 6/11/2024 | Not Ready for Inspection | JOSE MACIAS |
| ELECTRICAL-Rough | 6/11/2024 | Corrections Issued | JOSE MACIAS |
| HVAC-Rough | 6/11/2024 | Corrections Issued | JOSE MACIAS |
| PLUMBING-Rough | 6/11/2024 | Corrections Issued | JOSE MACIAS |
| ELECTRICAL-Rough | 6/14/2024 | Not Ready for Inspection | JOSE MACIAS |
| HVAC-Rough | 6/14/2024 | Not Ready for Inspection | JOSE MACIAS |
| PLUMBING-Rough | 6/14/2024 | Not Ready for Inspection | JOSE MACIAS |
| Wood Frame | 6/14/2024 | Not Ready for Inspection | JOSE MACIAS |
| BUILDING-Rough-Frame | 6/18/2024 | Permit Closed | JOSE MACIAS |
| ELECTRICAL-Rough | 6/18/2024 | Permit Closed | JOSE MACIAS |
| HVAC-Rough | 6/18/2024 | Permit Closed | JOSE MACIAS |
| PLUMBING-Rough | 6/18/2024 | Permit Closed | JOSE MACIAS |