6718 S 7TH AVE 90043

Certificate Information: 6718 S 7TH AVE 90043

Application / Permit
24016-10000-13763
Plan Check / Job No.
X24LA04489
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
11 Window and 2 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24. Including Mechanical. Electrical, Plumbing and HVAC 1 Kitchen 2 Bathroom remodel for residential buildings (no structural changes). Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 (b) 2B
Permit Issued
Issued on 4/25/2024
Issuing Office
Metro
Current Status
Permit Closed on 6/20/2024

Permit Application Status History

Issued 4/25/2024 APPLICANT
Permit Closed 6/18/2024 JOSE MACIAS
Permit Closed 6/18/2024 JOSE MACIAS
Permit Closed 6/18/2024 JOSE MACIAS
Permit Closed 6/18/2024 JOSE MACIAS

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 5/11/2024 Approved JESUS RODRIGUEZ
ELECTRICAL-Rough 5/18/2024 Corrections Issued HERBERT GIRON
HVAC-Rough 5/18/2024 Corrections Issued HERBERT GIRON
PLUMBING-Rough 5/18/2024 Corrections Issued HERBERT GIRON
Special/Order Compliance 5/18/2024 Corrections Issued HERBERT GIRON
BUILDING-Rough-Frame 6/11/2024 Not Ready for Inspection JOSE MACIAS
ELECTRICAL-Rough 6/11/2024 Corrections Issued JOSE MACIAS
HVAC-Rough 6/11/2024 Corrections Issued JOSE MACIAS
PLUMBING-Rough 6/11/2024 Corrections Issued JOSE MACIAS
ELECTRICAL-Rough 6/14/2024 Not Ready for Inspection JOSE MACIAS
HVAC-Rough 6/14/2024 Not Ready for Inspection JOSE MACIAS
PLUMBING-Rough 6/14/2024 Not Ready for Inspection JOSE MACIAS
Wood Frame 6/14/2024 Not Ready for Inspection JOSE MACIAS
BUILDING-Rough-Frame 6/18/2024 Permit Closed JOSE MACIAS
ELECTRICAL-Rough 6/18/2024 Permit Closed JOSE MACIAS
HVAC-Rough 6/18/2024 Permit Closed JOSE MACIAS
PLUMBING-Rough 6/18/2024 Permit Closed JOSE MACIAS